My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1992
CBCC
>
Meetings
>
1990's
>
1992
>
11/3/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:34 PM
Creation date
6/16/2015 11:22:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/03/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 31992 BOOK <br />ANALYSIS <br />87 FADE 968 <br />We will be advertising to bid the Oslo Road west force main project <br />within the next two months. The proposed force main along 27th <br />Avenue will connect into the Oslo Road west force main project and <br />connect Squire Village to the Countyls system. Per the developer"s <br />agreement, the County will own and operate the wastewater treatment <br />plant at Squire Village until such time as the system can be connected <br />to County sewer. The Utilities Department is able to operate the <br />facility; however, the Department would rather abandon the plant as <br />soon as possible and connect to the County sewer system. The <br />estimated project costs are as follows: <br />Construction plus <br />Contingency 10$ $46,280.00 <br />Engineering 10% 4.628.00 <br />Total 50,908.00 <br />Funding for this project will be from the impact fee fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the above-outlined.project at <br />Squire Village and authorize the expenditure of $51,00�O.Ob from the <br />impact fee fund for the project. <br />Commissioner Scurlock wondered whether the $50,908.00 includes <br />removal of the facility, and Director Davis replied that the <br />$50,908.00 is only for engineering design and construction of the <br />force main from the south end of Squire Village to Oslo Road. <br />Commissioner Scurlock wanted to know whether the salvage value <br />of the plant is equal to the removal cost, and Director Pinto <br />explained that our standard agreement, when the County takes over <br />a system, is to have someone come in and restore the ground in <br />exchange for the facility. <br />Commissioner Scurlock asked whether the land on which the <br />plant is located will now be returned to the park owner, and <br />Director Davis responded that the land will be returned to the park <br />owner except for a 201 x 201 piece over the County's lift station. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />the removal of the Squire Village Mobile Home Park <br />Wastewater Treatment Plant and authorized the <br />expenditure of $51,000.00 from the impact fee fund <br />for the project, as recommended by staff. <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.