My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1992
CBCC
>
Meetings
>
1990's
>
1992
>
11/3/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:34 PM
Creation date
6/16/2015 11:22:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/03/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH COUNTY SCHOOLS, COUNTY ROUTE 512 SEWER FORCE MAIN AND <br />ASSOCIATED LIFT STATION. PROPOSED CHANGE ORDER NO. 1 <br />Director Pinto presented the following memo dated October 26, <br />1992: <br />DATE: <br />TO: <br />FROM: <br />PREPARED <br />AND STAFFED <br />BY: <br />SUBJECT: <br />BACKGROUND <br />OCTOBER 26, 1992 <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />WILLIAM F. cCAIN <br />CAPITAL ENGINEER <br />DEPAR ITY SERVICES <br />NORTH COUNTY SCHOOLS, COUNTY ROUTE 512 SEWER FORCE MAIN <br />AND ASSOCIATED LIFT STATION, PROPOSED CHANGE ORDER NO. 1 <br />IRC PROJECT NO. US -91 -21 -CS <br />On October 6, 1992, the Indian River County Board of County <br />Commissioners awarded the above -referenced project to Owl and <br />Associates, Inc. The awarded contract is in the amount of $238,451.00. <br />Since the design and bidding of this project, several things have <br />occurred; the first was Board of County Commissioners" approval to <br />immediately service the Route 512 and I-95 commercial node with water <br />and sewer. Secondly, the master plan for this area has now been <br />completed by our consultant, Brown and Caldwell, indicating tbeā¢need to <br />enlarge approximately 6,000 linear feet of the force main for future <br />service to the commercial node, and to provide adequate capacity to <br />serve to 102nd Terrace (i.e., proposed Macho Industries and other <br />industrial use sites). The Utilities Department is therefore <br />requesting approval of the attached change order to increase the force <br />main to the appropriate size. <br />ANALYSIS <br />The proposed changes to this contract are outlined in the attachment to <br />the requested change order. The total amount of the proposed change <br />order is $46,739.00. The installed pipe costs are in line with other <br />projects of this magnitude, and were negotiated in good faith with the <br />contractor. Funds for this additional work will come from the impact <br />fee fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the attached change order with <br />Owl and Associates, Inc., in the amount of $46,739.00. <br />35 <br />BOOK C57 FvUE 969 <br />NOV 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.