My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/26/1993
CBCC
>
Meetings
>
1990's
>
1993
>
1/26/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:52 PM
Creation date
6/16/2015 12:27:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/26/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fr'_ <br />JAN 2 6 I3 BOOK 88 Fars 664 -7 <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Tippin, the Board unanimously approved <br />Change Order No. 1 with GBS Excavating, Inc., for a <br />contract reduction of $7,500.00, as recommended by <br />staf f . <br />CHANGE ORDER IS ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />PROPOSED CHANGE ORDERS - CONSTRUCTION OF CR -512 COMMERCIAL NODE - <br />WATER AND WASTEWATER <br />The Board reviewed the following memo dated January 14, 1993: <br />DATE: JANUARY 14, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI SERVICES <br />PREPARED WILLIAM F. cCAIN <br />AND STAFFED_ CAPITAL PR C INEER <br />BY: DEPAR UTILITY SERVICES <br />SUBJECT: PROPOSED CHANGE ORDERS - CONSTRUCTION OF THE C.R. 512 <br />COMMERCIAL NODE - WATER AND WASTEWATER SERVICE <br />IRC PROJECT NUMBERS: US -92 -24 -CS AND UW -92 -23 -DS <br />BACKGROUND <br />On August , 1992, the Indian River County Board of County <br />Commissioners approved the design and construction of master -planned <br />water and sewer lines to the intersection of C.R. 512 and *I-95 <br />(commercial node). (See attached agenda item and minutes.) The <br />project is currently in the permitting stage with DER and is on <br />schedule. (See attached cost summary and schedule.) <br />ANALYSIS <br />As can be seen from the attached schedule, if standard bidding and <br />construction procedures are utilized, construction could not begin <br />until March 30, 1993 at the earliest. With a 120 -day construction <br />time, this process could be shortened by ± 3 months if change orders <br />to existing contracts were utilized. The original cost estimates <br />for the water and sewer service, respectively, were $684,720.00 and <br />$250,000.00. We feel that negotiated change orders to the existing <br />contracts (which terminate at the beginning of this project, see <br />attached maps) with Boyce Company (water) and Owl and Associates <br />(sewer) would save the County both time and money. We have <br />negotiated the change order costs (see attached) as follows: <br />Sewer <br />Water <br />38 <br />$195,223.00 <br />$435,743.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.