Laserfiche WebLink
WASTEWATER SERVICE TO 102ND TERRACE AND 99TH WAY <br />Nonassessed Cost covered by impact <br />fees as regional system <br />Construction Costs - Lift Station <br />Force Main <br />10% Engineering <br />10% Contingency <br />Portion to be assessed to Property <br />Owners <br />Construction - Collection System <br />10% Engineering <br />10% Contingency <br />Administrative <br />Total estimated construction cost, including <br />engineering and administration <br />$60,000.00 <br />32.520.00 <br />$92,520.00 <br />9,252.00 <br />9.252.00 <br />$111,024.00 <br />$184,600.00 <br />18,460.00 <br />18,460.00 <br />1.650.00 <br />$223,170.00 <br />$334,194.00 <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously adopted <br />Resolution 93-61, providing for wastewater force <br />main extension to 102nd Terrace and 99th Way; etc. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously adopted <br />Resolution 93-62, setting a time and place at which <br />the owners of properties located generally in the <br />area of 102nd Terrace and 99th Way may appear before <br />the Board of County Commissioners, etc. <br />Vf7 <br />900K FAGE 1081 <br />BAR - 9 1993 <br />