My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/27/1993
CBCC
>
Meetings
>
1990's
>
1993
>
7/27/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:08:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/27/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
driveway will be located a safe distance from the Barber Avenue <br />(37th Street)/Indian River Boulevard intersection. -..The base <br />material will be protected with filter fabric and sodded. When the <br />property is developed, the owner will remove the sod and pave. <br />The attached agreement from H.F. Lenz Company provides for survey, <br />design and development of plans for construction of the proposed <br />full access driveway at a cost of $2,800. <br />H.F. Lenz is currently under contract with the County to design <br />improvements on 37th Street. Construction of the proposed driveway <br />will probably be bid with the 37th Street improvements. For the <br />above reasons, staff feels that H.F. Lenz can best perform the <br />proposed work. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the Board authorize the Chairman to execute <br />the attached Agreement. Funding is from Account 309-214-541-033.13 <br />- Indian River Boulevard Phase III. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />the contract with H. F. Lenz Company for <br />Professional Engineering and Surveying Services for <br />Driveway Connection, as recommended by staff. <br />SAID AGREEMENT <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />CONSTRUCTION MATERIALS TESTING - INDIAN RIVER BOULEVARD PHASE IV, <br />AMENDMENT NO. 1 <br />The Board reviewed memo from Capital Projects Manager Terry <br />Thompson dated July 19, 1993: <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E.�� <br />Public Works Directo�i�a' <br />FROM: Terry B. Thompson, P.E.,�'✓� <br />Capital Projects Manager 1 <br />SUBJECT: Construction Materials Testing <br />Indian River Boulevard Phase IV <br />Amendment No. 1 <br />DATE: July 19, 1993 <br />DESCRIPTION AND CONDITIONS <br />FILE: irbtest.agn <br />Professional Services Industries, Inc. (PSI) is under contract <br />with Indian River County to provide materials testing services <br />during the construction of Indian River Boulevard Phase IV. <br />37 <br />L_ JUL 271993 <br />Bou 90 PAGE 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.