® � r <br />DATE: JULY 16, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINT <br />DIRECTOR OF UTI ITY ERVICES <br />PREPARED WILLI t!M IN <br />AND STAFFED CAP CTS ENGINEER <br />BY: DEPAR LITY SERVICES <br />SUBJECT: BIDDING AND CONSTRUCTION OF WATER AND WASTEWATER TO <br />COMMERCIAL/INDUSTRIAL NODES, ROUTE 60 AND I-95 <br />IRC PROJECT NOS. US -92 -27 -CS, UW -92 -28 -DS AND <br />US -93 -11 -CS <br />BACKGROUND <br />On August 25, 1992, the Board <br />design of the above projects. <br />The design and permitting of <br />Utilities Department is prepare <br />ANALYSIS <br />of County Commissioners approved the <br />(See attached agenda item and minutes.) <br />these projects are complete and the <br />d to bid and construct the projects. <br />As stated in the August 25, 1992, agenda item, we were to come back to <br />the Board of County Commissioners with final cost estimates and request <br />authorization to bid the master planned water main and sewer force <br />main. We have also designed a gravity collection system for the north <br />side of State Road 60 east of I-95. This design was utilized in lieu <br />of splitting the force main on both sides of the road as it will reduce <br />the cost of connection for the properties to be served on the north. <br />If a force main were utilized, each property would require a lift <br />station; this design allows the use of an existing master lift station <br />and gravity connections. The cost estimates for construction are as <br />follows: <br />Master Planned Lines <br />Wastewater force main $205,000.00 <br />Water main $318,000.00 <br />Gravity sewer 97.625.00 <br />Total Project Cost: $620,625.00 <br />All project construction is within the DOT right-of-way, and therefore <br />the prices used for estimating have been very conservative. Funding <br />for these master planned utilities will be from the impact fee fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners authorize the Utilities Department to bid <br />the master planned projects and proceed immediately with award and <br />construction, and also to proceed with the assessment process for the <br />north side of Route 60 as stated. <br />43 <br />L_ JUL 271993 Boa 90 FA;E 79 <br />