Laserfiche WebLink
r- <br />AUG 2 4 19-9 <br />NEW HORIZONS MOBILE HOME PARK SEWER CONSTRUCTION <br />DATE: <br />BOOK 90 Pg F. <br />The Board reviewed the following memo dated August 17, 1993: <br />AUGUST 17, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PIN;Oj��� <br />DIRECTOR OF UTSERVICES <br />PREPARED WILLI F MCCAIN <br />AND STAFFED CAPIT CTS ENGINEER <br />BY: DEP ITY SERVICES <br />SUBJECT: NEW HORIZONS MOBILE HOME PARR SEWER CONSTRUCTION <br />IRC PROJECT NO. US -93 -16 -CS <br />BACKGROUND <br />On June 8, 1993, the Indian River County <br />approved the design of a subregional lift <br />Mobile Home Park and the surrounding <br />complete and permitting is under way. <br />ANALYSIS <br />This project was initiated by Indian <br />Department of Health and Rehabilitative <br />Environmental Protection, and the Boar <br />eliminate the severe health risk which <br />sewer collection and treatment system. <br />Board of County Commissioners <br />station to serve New Horizons <br />area. This design is 100$ <br />River County Utilities, the <br />Services, the Department of <br />Board of County Commissioners to <br />exists with the New Horizons <br />On August lo, 1993, while finalizing all remaining utility information <br />at the New Horizons site, we found the sewer collection system had been <br />backed up for at least three days and the lift station was within <br />several inches of overflowing. Also, it should be noted that power <br />will be disconnected by Florida Power and Light in the near future due <br />to nonpayment. This system continues to be plagued with failures, and <br />we now feel that the existing lift station and wastewater treatment <br />plant must be taken off line immediately. <br />We are requesting authorization to acquire at least three quotes from <br />utility contractors that are currently under contract with the County, <br />and award a change order to the contractor with lowest quote allowing <br />us to proceed with the construction of the lift station and force main <br />in the most expeditious manner. The contract will be done as a change <br />order, not to exceed the project's estimated cost of $110,000.00. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners grant us authorization to acquire quotes <br />for and proceed with the construction of this project with no further <br />Board action required. <br />30 <br />