My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/24/1993
CBCC
>
Meetings
>
1990's
>
1993
>
8/24/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:54 PM
Creation date
6/16/2015 1:17:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/24/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTION WAS MADE by Commissioner Eggert, SECONDED by <br />Commissioner Tippin, to acquire quotes and proceed <br />with construction of a subregional lift station to <br />serve New Horizons Mobile Home Park with no further <br />Board action required, as recommended by staff. <br />Under discussion, Commissioner Macht asked if there was any <br />guarantee that we will get paid for this project. <br />Director Pinto responded that there is no guarantee we will <br />ever get paid. However, a few weeks ago their system failed and <br />raw sewage was overflowing onto the streets and the County had to <br />rectify the problem. We will continue to place liens on the <br />property. <br />Attorney Vitunac advised that our agreement with the FDIC <br />provides for us to get all our money back. If that does not <br />happen, we have the ability to foreclose on our liens. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />Commissioner Adams asked what when the Federal Deposit <br />Insurance Corporation (FDIC) expects to have the foreclosure and <br />sale completed. <br />Director Pinto responded that the foreclosure action has been <br />complicated by the bankruptcy action filed by the owner. <br />Attorney Vitunac advised that the terms of the agreement <br />requires the FDIC to proceed with due haste to conclude this <br />matter. Attorney Vitunac recommended that we give them until <br />October. <br />CHANGE ORDER NO. 1 WITH TREASURE COAST CONTRACTING IS ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />ENGINEERING SELECTION FOR DESIGN AND CONSTRUCTION INSPECTION OF <br />VARIOUS WATER MAINS AND SUBDIVISION DISTRIBUTION SYSTEMS AND/OR <br />u WASTEWATER COLLECTION OR TRANSMISSION SYSTEMS THROUGHOUT THE COUNTY <br />The Board reviewed the following memo dated August 17, 1993: <br />31 <br />BOOK 90 PAGE'11J <br />AUG 2 4 1993 J <br />
The URL can be used to link to this page
Your browser does not support the video tag.