Laserfiche WebLink
benefitted owners in the area to bring the roads and drainage <br />facilities up to County standards. An alternative would be to <br />construct unpaved roads similar to those in Vero Lake Estates and <br />add them to the grader route, but that would result in recurring <br />maintenance costs to the County. He directed the Board's attention <br />to the following memo dated June 10, 1993: <br />TO: Roger D. Cain, P.E. <br />County Engineer <br />FROM: Michelle A. Gentile, CET <br />Civil Engineer <br />SUBJECT: Cost Estimate for Upgrading Roads in Pine Lake Subdivision <br />DATE: June 10, 1993 <br />Per your request, I have obtained cost estimates for the property owners in the Pine Lake <br />Subdivision. I have met with Terry Cook and discussed the Pine Lake Subdivision roads and asked <br />him if he could supply me with some costs for clearing, grading and shell material. <br />The attached map shows approximately 7,211 L.F. of roadway that needs to be unproved. Based <br />on Terry's costs, construction of this unimproved roadway would be approximately $12.25 per <br />Lineal Foot. <br />The following is a list of the interior roads located within Pine Lake Subdivision: <br />Interior Street Name Lineal Foot Front Footage <br />104th Court <br />1930 L.F. <br />3,610 FF <br />105th Avenue <br />1560 L.F. <br />2,850 FF <br />105th Court <br />1940 L.F. <br />3,600 FF <br />92nd Place <br />540 L.F. <br />1,140 FF <br />93rd Lane <br />256 L.F. <br />512 FF <br />93rd Place <br />985 L.F. <br />1.650 FF <br />7211 L.F. <br />13,392 FF <br />The following exterior roads border Pine Lake Subdivision: <br />Exterior Street Name Lineal Foot Front Footage <br />104th Avenue 1930 L.F. 3,800 FF <br />106th Avenue 1940 L.F. 3,720 FF <br />3870 L.F: 7,520 FF <br />Additional costs to pave these roads would amount to $47,407.50. <br />21 <br />�9�� BOOK 90 f -n- 616 <br />