My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/12/1993
CBCC
>
Meetings
>
1990's
>
1993
>
10/12/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:55 PM
Creation date
6/16/2015 1:34:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/12/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br />12 93 <br />BOOK 90 <br />FADE 763" <br />JUNGLE TRAIL WATER LINE EXTENSION <br />- NORTH BEACH REVERSE OSMOSIS <br />PLANT <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated September 29, 1993: <br />DATE: <br />SEPTEMBER 29, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM�OCFCUTILITY <br />N <br />AND STAFFED CAPITALENGINEER <br />BY: DEPAR SERVICES <br />SUBJECT: JUNGLE TRAIL WATER LINE EXTENSION <br />NORTH BEACH R.O. PLANT <br />INDIAN RIVER COUNTY PROJECT NO. UW -93 -27 -DS <br />BACKGROUND <br />With the completion of our new Master Plan, capital projects have <br />been identified through the year 2010. One of the immediate <br />projects is the construction of a water transmission main on a <br />portion of Jungle Trail. This line will be constructed from the <br />entrance of the North Beach Water Plant north on Jungle Trail to our <br />existing water line on County Road 510. This line will act not only <br />as a secondary feed line from the plant to the distribution system <br />but will also aid in maintaining proper pressure in the distribution <br />system. <br />ANALYSIS <br />The Master Plan identifies a 10 -inch water line on Jungle Trail <br />approximately 2,500 linear feet in length (see attached Master Plan <br />exhibit). The Utilities staff is proposing to design this line <br />in-house going outside for surveying services only. The project <br />costs are estimated as follows: <br />Construction $62,500.00 <br />10% contingency 6,250.00 <br />lot engineering, surveying, inspection 6.250.00 <br />Total estimated project cost $75,000.00 <br />We are in front of the Board of County Commissioners for approval of <br />this project and for authorization to solicit quotes for the <br />required surveying work, allowing us to proceed with the project <br />design. Funding for this project will be from the impact fee fund. <br />The staff of the Department of Utility Services recommends the Board <br />of County Commissioners approve the commencement of the Jungle Trail <br />project as presented. <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.