My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/2/1993
CBCC
>
Meetings
>
1990's
>
1993
>
11/2/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:55 PM
Creation date
6/16/2015 1:39:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK �® rnF 9,636 <br />NOV - 21Q9 <br />Chairman Bird thanked Mr. Fuller for his excellent <br />presentation. <br />Director Pinto advised that no action is needed at this time. <br />Copies of the Executive Summary have been distributed to the Board <br />for their perusal, but the actual changes of the master plan will <br />be brought back to the Board for approval of their incorporation <br />into the master plan. <br />SOUTH REGION WASTEWATER REPUMP STATION TRANSMISSION SYSTEM - WORK <br />AUTHORIZATION NO. 1 - MASTELLER AND MOLER, INC. <br />The Board reviewed the following memo dated October 7, 1993: <br />DATE: OCTOBER 7, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI SERVICES <br />PREPARED WILLIAMF. c IN <br />AND STAFFED CAPITAL ENGINEER <br />BY: DEPAR UTILITY SERVICES <br />SUBJECT: SOUTH REGION WASTEWATER RSPDHP STATION TRANSMISSION <br />SYSTEM - WASTEWATER WORK AUTHORIZATION NO. 1 <br />INDIAN RIVER COUNTY PROJECT NO. IIS -93 -28 -CS <br />�IA� <br />On September 28, 1993, the Board of County Commissioners approved a <br />continuing services contract with Masteller and Moler, Inc., for <br />wastewater collection system design services (see attached <br />continuing services contract). With the County closing on its <br />purchase of GDU's South County Wastewater Treatment Plant, we will <br />now be diverting sewer flow from Oslo Road (the site of our <br />previously planned South County WWTP) south to the GDU WWTP (see <br />attached exhibit by Brown and Caldwell). The Utilities Department <br />has negotiated a contract with Masteller and Moler for the design, <br />construction; administration, and inspection of the above -referenced <br />project. <br />The estimated construction cost for this project is $1,752,151.50, <br />-which includes a 10% contingency. The negotiated fee for design and <br />inspection is $131,000.00, with an additional $31,000.00 for <br />surveying services (see .attached Work Authorization No. 1 for <br />details). The fee is a lump sum negotiated contract, which is well <br />within the acbeptable range for a project of this magnitude. For <br />comparison purposes --if the Farmer's Home curves were utilized, the <br />fees would be $176,120.00± for engineering and inspection alone. <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve 'the attached Work <br />Authorization No. 1 with Masteller and Moler, Inc., as presented. <br />44 <br />w <br />
The URL can be used to link to this page
Your browser does not support the video tag.