Laserfiche WebLink
INTERCONNECTION OF GROVE ISLE TO SOUTH COUNTY WASTEWATER <br />TREATMENT FACILITY <br />The Board reviewed the following memo dated 11/18/93: <br />DATE: <br />NOVEMBER 18, 1993 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINT�� " <br />DIRECTOR OF UTI -"VICES <br />STAFFED AND <br />PREPARED BY: ROBERT 0. WISEMEN, P.E <br />ENVIRONMENTAL ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: INTERCONNECTION OF GROVE ISLE TO SOUTH COUNTY <br />WASTEWATER TREATMENT FACILITY <br />IRC PROJECT NO. US -93 -31 -CS <br />Recently, the Department of Utility Services acquired the Vero <br />Highlands/General Development Utilities Wastewater Treatment <br />Facility. The facility is at fifty percent capacity and is called <br />the South County Regional Wastewater Treatment Facility. <br />Due to recent rate increases and the County reaching its contract <br />capacity with the City, the Department needs to divert the sewer <br />flow from subdivisions on U.S. Highway 1, which presently flow to <br />the Vero Beach Wastewater Treatment Facility, to the South County <br />Regional Wastewater Treatment Facility. <br />ANALYSIS: <br />The construction cost of interconnection is estimated at <br />$278,250.00. It includes the cost for modifying the present lift <br />station to handle additional flow, and approximately 4,500 linear <br />feet of sewer force main. The department received -three proposals <br />to do surveying services for design of this project; Carter <br />Associates, Inc., submitted the lowest of the three proposals. The <br />project will be designed, permitted, and administered by in-house <br />staff, and the cost for this project will be paid from impact fee <br />funds. <br />The staff of the <br />approval of* this <br />proposal to survey. <br />DEC - 7 1993 <br />Department of Utility Services recommends the <br />project and approval for Carter Associates' <br />106 <br />600K 91 F,1GF. 9 <br />