My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/4/1994
CBCC
>
Meetings
>
1990's
>
1994
>
1/4/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:22 PM
Creation date
6/16/2015 1:39:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/04/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
800K 91 F�GE 3 0 <br />turn lanes for the 82nd Avenue entrance when phase 2 of the Sabal <br />Trace project is developed (see attachment #7). <br />Furthermore, Public Works and Emergency Services staff recommend <br />that phase 2 of the Sabal Trace project include a paved roadway <br />connection to 12th Street rather than a dead end cul-de-sac (see <br />attachment #7 & #8). Based upon LDR Chapter 913.07(4)(H)(1)b. & <br />c., 913.09(3)(c)4. and 913.09(3)(D) which address secondary access, <br />emergency access, and dead end cul-de-sac length issues, it is <br />staff's opinion that a paved roadway connection from the project to <br />12th Street or to an adjacent project that directly connects to <br />12th Street should be required via a D.O. condition (see attachment <br />#9). Such a condition would ensure adequate secondary and <br />emergency access for the Sabal Trace subdivision and would <br />eliminate development of a ±3,700' long dead end cul-de-sac <br />roadway. <br />Subject to the previously referenced zoning, buffer, and traffic <br />conditions, staff has no objection to approval of the NOPC request. <br />Staff's proposed D.O. resolution (see attachment #10) incorporates <br />the following "conditions": <br />A. That prior to subdivision preliminary plat approval of any <br />project phase, the applicant shall apply for and obtain <br />rezoning of the phase to an appropriate residential single <br />family zoning district. <br />B. That in conjunction with the development of the Sabal Trace <br />subdivision project, the developer shall provide along the <br />northern and western boundary of the project the buffer that <br />is required by the LDRs to be provided between mobile home <br />development and lower density residential development. <br />C. That no building permit(s) shall be issued for the project <br />beyond the traffic analysis date (2005) unless and until the <br />traffic analysis is updated. <br />D. That phase 2 of the Sabal Trace project shall be designed and <br />constructed to provide a paved roadway connection to 12th <br />Street or to an adjacent project that directly connects to <br />12th Street. <br />E. That phase 2 of the Sabal Trace project shall be designed and <br />constructed *to provide a left turn.. lane and a right turn <br />deceleration lane at the project's 82nd Avenue entrance. Said <br />turn lanes shall meet or exceed county standards. As an <br />alternative to providing the turn lanes, the applicant may <br />provide to the county at the time of phase 2 preliminary plat <br />approval an updated traffic analysis that addresses the need <br />lor the turn. lanes.._. If the- updated arialysis is acceptable to <br />the county -traffic engineer, and if the analysis demonstrates <br />that no turn lanes are needed under county traffic LDRs, then <br />no turn lanes shall be required. <br />Thus, in staff's opinion, the proposed resolution contains all of <br />the appropriate D.O. conditions recommended by staff and the <br />Planning and Zoning Commission. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners: <br />1. Determine that the NOPC request <br />substantial deviation. <br />18 <br />does not constitute a <br />
The URL can be used to link to this page
Your browser does not support the video tag.