My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/5/1994
CBCC
>
Meetings
>
1990's
>
1994
>
1/5/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:22 PM
Creation date
6/16/2015 1:40:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
01/05/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRM <br />To: Stan Boling <br />Planning Director Community Development <br />From: Daniel Dietz % <br />Fire Prevention Bureau Chi �o� <br />Date: 12/28/93 1y <br />Subject: Temporary land clearing debris sites <br />As a result of this mornings meeting with Mr. Hiers and the E.G.I. Group, some of the <br />proposed ordinance requirements originally submitted by this office have changed. <br />Specifically, under section 972.08(6) we have no objection to the following changes that <br />were discussed; <br />6(E) The location of the burn pit being (100) feet from any "tree line" is acceptable. <br />tc• • .�: _ ► 11• .1 WM • j - - ••WN, R @719 1@101 <br />1. Maximum pile sizes of (50) feet by (100) feet by (15) feet in height. <br />1. Maximum pile sizes of (75) feet by (125) feet by (30) feet in height. <br />In reference to paragraph 6(A), this office will gladly review the submitted scaled drawings <br />for site dimensions, stockpile dimensions, set -backs, burn pit and incinerator set-up.and <br />similar fire safety factors. Please note that we cannot perform the much needed review <br />of traffic influences created by the site. <br />This office will perform whatever role you deem necessary in the permitting process. If <br />a temporary use permit Is required please advise how we verify approval prior to issuing <br />a permit. If a temporary use permit is not required I would offer this office as the sole <br />application point where we could forward all information through public works via inter- <br />office mail. <br />If any additional information is needed please contact me. <br />Commissioner Bird was absent from the previous public hearing <br />and asked for clarification regarding the debris which can be <br />burned at a temporary site. <br />Director Boling advised that debris from that site or from <br />other sites being cleared by that land clearing contractor can be <br />burned at that site, but they cannot receive and burn debris for <br />anybody else. <br />The Chairman opened the public hearing and asked if anyone <br />wished to be heard in this matter. <br />5 1994 <br />5 <br />BOOK 91 PAGE 415 <br />
The URL can be used to link to this page
Your browser does not support the video tag.