My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/25/1994
CBCC
>
Meetings
>
1990's
>
1994
>
1/25/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:23 PM
Creation date
6/16/2015 1:42:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/25/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utility Services Director Terry Pinto explained that the <br />additional cost was the result of decisions, made in the field. He <br />indicated that additional details would be provided to Commissioner <br />Macht. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />CHANGE ORDER NO. 1 IS ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />CENTRAL REGION EFFLUENT DISPOSAL PROJECT - CHANGE ORDER NO. 1 <br />The Board reviewed the following memo dated January 14, 1994: <br />DATE: JANUARY 14, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATO <br />FROM: •TERRANCE G. PINT <br />DIRECTOR OF UTIL TY ERVICES <br />PREPARED ROBERT O. WISEMEN, P.E <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />�W <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: CENTRAL REGION EFFLUENT DISPOSAL PROJECT <br />CHANGE ORDER NO. 1 - <br />INDIAN RIVER COUNTY NO. US -90 -23 -ED <br />On May 4, 1993, the Board of County Commissioners awarded the contract <br />to Speegle Construction, Inc., in the amount of $1,713,000.00 to <br />construct the above -referenced project. (See attached agenda item.) <br />The construction has progressed in a timely manner. <br />ANALYSIS <br />In the early construction, the contractor found trash on the project <br />site covered by dirt and vegetation. The trash consists of white <br />goods, golf carts, bulky concrete, pipe and other various types of <br />objects. This trash has exceeded the amount of unsuitable material to <br />be disposed of off-site. The inorganic/metal trash was hauled <br />off-site which left us with a high organic -mixed dirt mound that needs <br />to be disposed of. The excess, unsuitable material exceeded 25,000 <br />cubic yards. Per our contract with Speegle Construction, Inc., this <br />would have cost the County $200,000.00. ($8.00 per cubic yard). <br />In the same period, due to security purposes and other reasons, the <br />Bent Pine Homeowners Association requested an enclosure to be built <br />along Storm Grove Road. Construction of the earth berm was reviewed <br />as an option for disposal of the material. The option was negotiated <br />with the contractor at $40,000.00. The leftover material is to be <br />disposed of, off-site, at no cost to the County. Along with this <br />41 <br />BOOK, 91FAGE 6aJ� <br />,JAN 25 1994 J <br />
The URL can be used to link to this page
Your browser does not support the video tag.