Laserfiche WebLink
FINAL CONNECTION OF WATER AND SEWER LINES TO COMPLETED PROJECTS: <br />LANDFILL LIFT STATION, NORTH COUNTY SCHOOLS AND SUNSHINE TRAVEL <br />PARR <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated January'24, 1994: <br />DATE: <br />TO: <br />FROM: <br />PREPARED <br />AND STAFFED <br />BY: <br />SUBJECT: <br />JANUARY 24, 1994 <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />TERRANCE G. PINT <br />DIRECTOR OF UTILIT VICES <br />U' <br />WILL <br />IN <br />CAP S ENGINEER <br />DEPAR OF UTILITY SERVICES <br />FINAL CONNECTION OF COMPLETED PROJECTS; LANDFILL <br />LIFT STATION, NORTH COUNTY SCHOOLS AND SUNSHINE TRAVEL <br />PARK <br />Final payment and the Department of Environmental Protection clearance <br />has been acquired for the Landfill Wastewater Pumping Station and the <br />North County Water Distribution System. We are therefore now prepared <br />to connect the landfill sewer flows to the County Regional System as <br />well as County water to the North County Junior High School and the <br />Sunshine Travel Park. We have utilized costs from our existing yearly <br />labor contractor for these connections and are ready to proceed. <br />(See attached copy of agenda item and labor contract.) <br />ANALYSIS <br />The cost associated with these projects are as follows: <br />North County Junior High (Water) <br />Piping, backflow, meter and <br />miscellaneous fittings ( materials) <br />Construction <br />Sunshine Travel Park (Water) <br />Piping, backflow, meter and <br />miscellaneous (materials) <br />Construction <br />Landfill ( Sewer ) <br />Meter, miscellaneous fittings <br />(materials) <br />Construction <br />W1 <br />$ 8,984.58. <br />1,173.29 <br />Total $10,157.87 <br />$ 8,984.58 <br />$ 1.345.79 <br />Total $10,330.37 <br />$ 1,036.45 <br />$ 1.094.80 <br />Total $ 2,131.25 <br />BOOK 91 WE 662 <br />