My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/1/1994
CBCC
>
Meetings
>
1990's
>
1994
>
2/1/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:23 PM
Creation date
6/16/2015 1:44:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r- F E B d i `� N=! 119 <br />O <br />BOOK 91 PLUG 663 <br />For details of the materials and construction costs, see attached <br />proposed contracts with Driveways, Inc. and material quotes from Davis <br />Meters. Funding for the projects will be from the impact fee fund. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval of <br />the proposed actions as presented. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Macht, the Board unanimously approved <br />the Utility Services Department's proposed actions <br />as presented in staff's memorandum. <br />CITGO-GENERAL EQUITIES DEVELOPER'S AGREEMENT COST ADJUSTMENT <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated January 11, 1994: <br />DATE: JANUARY 11, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRk <br />FROM: TERRANCE O <br />DIRECTOR OF UT LI VICES <br />PREPARED WILLIAM cCA <br />AND STAFFED CAPI CTS ENGINEER <br />BY: DEP OF UTILITY SERVICES <br />SUBJECT: CITGO-GENERAL EQUITIES DEVELOPER'S A� <br />COST ADJUSTMENT <br />BACKGROUND <br />On January 5, 1993, the Indian River County Board of County <br />Commissioners approved a developer's agreement with General <br />Equities, Inc., for the construction of utilities on State Road 60. <br />The construction was for a 12 -inch force main and a 16 -inch water <br />main from the 90th Avenue intersection on State Road 60 to the west <br />edge of the Citgo gas station. As a result of the Master Plan <br />rework that was taking place at the same time, it necessitated that <br />the water main size be increased to 20 inches, with a corresponding <br />price increase, and a material change to DIP in lieu of PVC <br />specified -by the DOT. The engineering cost also has increased due <br />to additional surveying and redesign required by a DOT project that <br />was under way at the same time. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.