My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/22/1994
CBCC
>
Meetings
>
1990's
>
1994
>
2/22/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:23 PM
Creation date
6/16/2015 1:46:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/22/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER BOULEVARD, PHASE IV - CHANGE ORDER NO. 2 - DICKERSON <br />FLORIDA, INC. <br />The Board reviewed the following memo dated February 14, 1994; <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />FROM: Terry B. Thompson, P.E. <br />�10 <br />Capital Projects Manager <br />SUBJECT: Indian River Boulevard, Phase IB <br />Change Order No. 2 <br />DATE: February 14, 1994 FILE: IRBCO2.AGN <br />DESCRIPTION AND CONDITIONS <br />On Janury 25, 1994, the Board of County Commissioners authorized the transfer <br />of $10,440.00 from the Utilities impact fee fund to the Public Works contract <br />account for the installation of twenty-four inch (24") steel casing pipes at <br />41st and 45th Street in the Indian River Boulevard right-of-way. The <br />attached Change Order No. 2 provides for the installation of these steel <br />sleeves by the contractor for Indian River Boulevard Phase IV, Dickerson <br />Florida, Inc.. <br />Change Order No. 2 also includes increases that total $8,848.27 to relocate <br />the Whisper Lakes Golf Course driveway on 53rd Street approximateley 175 feet <br />east of its present location. This relocation moves the driveway away from <br />the intersection of 53rd Street with USI to provide increased traffic saftey. <br />The remainder of the items on Change Order No. 2 deal with erosion control, <br />drainage modifications, installation of conduit for grove irrigation and <br />construction of a leveling course on 53rd Street to eliminate irregularities <br />in the existing surface. The net change in contract price for Change Order <br />No. 2 is an increase in the amount of $36,395.78. <br />ALTERNATIVES AND ANALYSIS <br />The alternatives are as follows: <br />Alternative No. 1 <br />Authorize Change Order No. 2 in the amount of $36,395.78. This would <br />result in a revised contract amount of $3,550,161.77 <br />Alternative No. 2 <br />Deny authorization of change order and re -negotiate. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that Change Order No. 2 be approved. Funding is from <br />Account 309-215-541-066.51, Indian River Boulevard, Phase IV, construction in <br />progress. <br />31 <br />F E B 22 1994 <br />fiooK 91 FAGE799 <br />
The URL can be used to link to this page
Your browser does not support the video tag.