My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/19/1994
CBCC
>
Meetings
>
1990's
>
1994
>
4/19/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:24 PM
Creation date
6/16/2015 2:00:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/19/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve this proposed assessment project <br />and authorize engineering design servioes by the Department of Utility <br />Services staff. <br />ON MOTION by Commissioner Macht, SECONDED by <br />Commissioner Adams, the Board unanimously approved <br />the proposed assessment project and authorized staff <br />to proceed with engineering design services, as <br />recommended by staff. <br />ROSELAND WATER MAIN. PHASE IV <br />The Board reviewed the following memo dated April 8, 1994: <br />DATE: April S. 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATO <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI VICES <br />PREPARED ROBERT 0. WISEMAN, P.E <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: ROSELAND WATERMAIN, PHASE IV <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -06 -DS <br />In fiscal year 1993, the Department of Utility Services <br />successfully constructed a water transmission main along Roseland <br />Road, Phases I, II and III. Phase III is the construction of the <br />Roseland elevated water storage tank, which is in the final stage <br />of construction. The elevated water storage tank has been cleared <br />by F.D.E.P. to provide service. The constructed water main in <br />Phases I and II provide water to the intersection of Roseland Road <br />and U.S. Highway 1, which serves'Roseland Plaza and the Riverwalk <br />Shopping Centers. Recently, the Department received requests from <br />business establishments along U.S. Highway 1, North of Roseland <br />Road (See attached map) for water service. These requests <br />necessitate the construction of a water main extension to provide <br />to these establishments. <br />ANALYSIS <br />The proposed water main extension will be approximately 4,800 <br />linear feet and use a 16 inch PVC water main. The estimated cost <br />of this project, including survey, design, permitting, bidding, <br />inspection and construction administration is $211,690. The master <br />plan indicates that a 16 inch water main is required to serve the <br />37 <br />APR 19 1994 BooK 92 F.+r 9'.047 <br />
The URL can be used to link to this page
Your browser does not support the video tag.