My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/24/1994
CBCC
>
Meetings
>
1990's
>
1994
>
5/24/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:25 PM
Creation date
6/16/2015 2:12:17 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/24/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fl - <br />MAY 2 4 1994 ma 92 PAGE547 <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />the agreement with Masteller, Moler and Reed, Inc. <br />to survey the subject property in the amount of <br />$23,000, as recommended by staff. <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />NORTH COUNTY WATER TREATMENT PLANT - PHASE II - ENGINEERING DESIGN <br />AND CONSTRUCTION - CAMP DRESSER MCKEE <br />The Board reviewed the following memo dated 5/9/94: <br />DATE: MAY 9, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTIL VICES <br />PREPARED WILLIAM F. <br />AND STAFFED CAPITAL PRaCJE-ITYNGINEER <br />BY: DEPARTMENT OF SERVICES <br />SUBJECT: NORTH COUNTY WATER TREATMENT PLANT PHASE II <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -03 -WC <br />BACKGROUND <br />In November 1993, the Indian River County Board of County Commissioners <br />approved a contract with Camp Dresser and McKee, Inc., for the design <br />of the first phase of this project (see attached agenda item and <br />minutes). The first phase of the subject project is complete and the <br />Utilities Department is now ready to begin Phase II. Phase I of this <br />facility included high service pumps, ground storage, emergency power <br />and a temporary chlorination facility. All of these, except for the <br />chlorination facility, will be reused in Phase II. <br />The engineering services contract for Phase I included all design <br />associated with the above. A preliminary engineering report for the <br />entire facility and a membrane pilot study (to begin in late May) to <br />determine the best membrane to be specified for the plant as well as <br />site plan permitting was also included. The Utilities Master Plan <br />calls for the construction of a three million gallon.North County Water <br />Treatment Plant to begin in 1995. Therefore, we have negotiated an-- <br />engineering <br />n`engineering services contract with CDM for the design of Phase II of <br />this project. <br />ANALYSIS <br />The estimated construction cost of this project is $7,008,146. The <br />negotiated fee for engineering services, which includes engineering <br />design, inspection and contract administration is $839,000.00. For <br />breakdown of costs, please see table below: <br />102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.