My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/14/1994
CBCC
>
Meetings
>
1990's
>
1994
>
6/14/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:25 PM
Creation date
6/16/2015 2:23:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/14/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or dP � <br />- DATE: JUNE -81 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATO <br />FROM: TERRANCE G. PI 0 <br />DIRECTOR OF VICES <br />PREPAREDWIL F. MCCAIN <br />AND STAFFED PROJECTS ENGINEER <br />BY: DEP OF ILITY SERVICES <br />SUBJECT: DEVELOPER'S AGREEMENT WITH KAREN P. LOHSE FOR <br />SEWER COLLECTION SYSTEM CONSTRUCTION AND CONNECTION <br />BACKGROUND <br />On the attached exhibit, you will -see the servicearea of which this <br />project is a portion. This area was defined as part of a sewer <br />collection study by Kimball Lloyd and Associates, Inc., in 1991. <br />Several portions of the system to serve this area have been completed, <br />i.e., Rousseau River Shores (portion of low pressure force main) and <br />the Nancy Moon project (main electrical service panel and low pressure <br />force main). Per our agreement with Nancy Moon, we wish to enter into <br />a developer,'s agreement with Ms. T,ohse for her sewer connection. (See <br />attached agenda item, minutes and developer's agreement.). <br />ANALYSIS <br />The proposed developer's agreement with- Karen Lohse will' add an <br />additional sewer customer to the existing low pressure sewer collection <br />system fronting her property on Indian River Drive. (See attached <br />proposed developer's agreement). In this agreement, we are recovering <br />her proportional share of the existing system. In Exhibit "A" of the <br />agreement, our portion of her construction is $2,466.00. This portion <br />of the construction will- benefit the overall County utility system. <br />The developer's portion of the existing system is $2,502.12. This <br />equates to a final contribution by the developer of $36.12 to the.. <br />Utilities Department, along with an impact fee of $2,551.00. <br />This transaction will be worked into -the overall- assessment and will be <br />recovered through -additional developer"s agreements, as the connection <br />to our system was originally outlined in the August agenda item for the <br />Nancy -Moon project. <br />RECO290MA ION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the developerls agreement with <br />Ms. Lohse as presented. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Macht, the Board unanimously approved <br />the developer's agreement with Karen P. Lohse as <br />recommended by staff. <br />AGREEMENT <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />41 <br />JUN 141994 <br />POOK 9? FAGE640 <br />
The URL can be used to link to this page
Your browser does not support the video tag.