My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/28/1994
CBCC
>
Meetings
>
1990's
>
1994
>
6/28/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:25 PM
Creation date
6/16/2015 2:28:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/28/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item <br />#12 <br />Two hollow metal doors scheduled <br />1,092.00 <br />incorrectly on drawings. (ARCHITECT) <br />Item <br />#13 <br />Added and deleted some fire dampers. <br />3,966.00 <br />(ARCHITECT) <br />Item <br />#14 <br />Add goose neck vent on roof for elevator <br />915.00 <br />shift Number 2. (ARCHITECT) <br />Item <br />#15 <br />Lay -in -tile ceiling incorrectly specified. <br />1,363.00 <br />Ceiling deleted, light fixtures changed. <br />Item <br />#24 <br />(ARCHITECT) <br />2,458.00 <br />Item #16 Deleted Rynar finish on flagpoles. ( 630.00) <br />(ARCHITECT/OWNER) <br />Item #17 Relocate electrical feeder to relocated 3,272.00 <br />transformer. (ARCHITECT) <br />Item #18 Add GWB partition between Elevators on 330.00 <br />Penthouse. (ARCHITECT) <br />Item #19 Change wood door to metal as required by 174.00 <br />Fire Code. (ARCHITECT) <br />Item <br />#20 <br />Raise window sill height for Type 16 <br />69.00 <br />windows. (ARCHITECT) <br />Item <br />#21 <br />Change building expansion joint cover <br />-D- <br />in carpeted areas. (ARCHITECT) <br />Item <br />#22 <br />Lighting in Judges Parking lot omitted <br />6,365.00 <br />from plans. <br />Item <br />#23 <br />Add millwork counter and stud wall that - <br />799.00 <br />was left off plans. (ARCHITECT) <br />Item <br />#24 <br />Deleted tiebeam at 3 radiuses sections <br />2,458.00 <br />on third floor and thicken slab. <br />(ARCHITECT) <br />Item <br />#25 <br />Change two door frames from Type 2 to <br />770.00 <br />Type 5. (ARCHITECT) <br />Item <br />#26 <br />Change light fixture in Judges vestibule <br />-0- <br />(ARCHITECT) <br />Item #27 Add enclosure at head of Interstitial 519.00 <br />Windows. Not shown on plans. (ARCHITECT) <br />TOTAL $44,120.00 <br />Gary Glenewinkel, representing Centex Rooney, explained that <br />of the $421,000 changes to the project to date, approximately <br />$230,000 were owner -generated, and roughly $77,000 were due to <br />coordination between the various engineering disciplines and <br />changes to the documents, and about $115,000 resulted from code <br />revisions and unknown site conditions. <br />Discussion ensued regarding Items 2, 9, 22, window changes, <br />and the anticipated completion date. <br />JUN 28 1994 19 500. <br />
The URL can be used to link to this page
Your browser does not support the video tag.