My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/20/1994
CBCC
>
Meetings
>
1990's
>
1994
>
9/20/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:26 PM
Creation date
6/17/2015 2:41:47 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F_ <br />Item #28 Added smoke exhaust in elevator #5 <br />(ARCHITECT) <br />Item #29 Enclosed storm water line in elevator <br />machine room. (ARCHITECT) <br />Item #30 Revised signage package and deleted <br />State Seals. (ARCHITECT) <br />Item #31 Changed spandrel glass to inlet loovers <br />on 3rd floor. (ARCHITECT) <br />Item #32 Changed partition anchors to Tapcon <br />type over terrazzo floors. (ARCHITECT) <br />Item #33 Drywall chases were added to conceal <br />conduit and wiring in four areas. <br />(ARCHITECT) <br />BOOK 93 PAGE 341 <br />2,150.00 <br />487.00 <br />(1,058.00) <br />1,428.00 <br />250.00 <br />440.00 <br />Item #34 <br />Added drywall chase for plumbing in room <br />99.00. <br />- <br />-12 01.. (ARCHITECT) <br />Itiil*36cling <br />height changed due to -conflict <br />164.00 -- <br />with windows. (ARCHITECT) <br />Item #36. <br />Modified floor slab after installation to <br />1,143.00 <br />accommodate finish in three areas. <br />(ARCHITECT) <br />Item #37 <br />Enclosure around duct work omitted from <br />255.00 <br />plans in room 2224. (ARCHITECT) <br />Item #38 <br />Wrong type trench drain specified in <br />1,082.00 <br />parking garage. Cost for installation <br />only. (ARCHITECT) <br />Item #39 <br />Relocated drainage structure to avoid <br />1,150.00 <br />existing telephone cables not shown <br />on site survey. (OWNER) <br />Item #40 <br />Modify wall to accommodate fire valve <br />137.00 <br />cabinet in room 1127. <br />TOTAL <br />$71,064.00 <br />The new contract price is $10,069,808.02. <br />Gary Glenewenkle, Senior Vice President of Centex -Rooney, <br />presented an update on overall change orders and advised that <br />$233,900 is the result of owner -requested changes, while $154,916, <br />or 1.17%, of the original amount, is due to errors, which is normal <br />in the business. Based on the construction industry's standard on <br />a building of this size these changes are extremely low and very <br />favorable. <br />September 20, 1994 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.