My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/20/1994
CBCC
>
Meetings
>
1990's
>
1994
>
9/20/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:04:26 PM
Creation date
6/17/2015 2:41:47 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_I <br />BOOK 93 PnE 353 <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Macht, the Board unanimously approved <br />the Agreement with Driveways, Inc. which approves <br />Work Authorization No. 25 as set out in staff's <br />memorandum. <br />AGREEMENT <br />CLERK TO THE BOARD <br />ON FILE IN THE OFFICE OF THE <br />Telemetry System Upgrade for Water Plants and Distribution System <br />The Board reviewed a Memorandum of August 18, 1994: <br />DATE: AUGUST 18, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PIN <br />DIRECTOR OF UTI RVICES <br />PREPARED WILLIAM F. McCAIN <br />AND STAFFED CAPITAL PROJECTS EEER <br />BY: DEPARTMENT OF UTILI SERVICES <br />SUBJECT: TELEMETRY SYSTEM UPGRADE FOR WATER PLANTS AND <br />DISTRIBUTION SYSTEM <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -15 -WC <br />BACKGROUND <br />"Tlirougtiohtt" �CoUcty.•'s • • water •system;- "dedicated- . teleplione• lines <br />have been traditionally utilized for data transmission (i.e., <br />equipment status and control). For example,. elevated water storage <br />tanks are monitored by the water plants to initialize the on/off of <br />high service pumps. This, however, is a more minor role when <br />compared to the ability to operate the north county pumping station <br />in a totally remote fashion via the data lines to the South County <br />plant. As the County's facilities expand and the number of <br />dedicated data lines increase, the cost of data transmission <br />escalates. Currently, the yearly cost associated with dedicated <br />phone service is $7,000.00±. With this in mind, we wish to proceed <br />with the conversion of all data dedicated phone lines to a radio <br />telemetry system. <br />On June 22, 1993, the Indian River County Board of County <br />Commissioners approved the firm of Camp'Dresser and McKee as our <br />water plant continuing services engineering firm (see attached <br />agenda item and minutes). We have negotiated a not -to -exceed <br />contract with CDM for engineering services on this project (see the <br />attached proposed Work Authorization). <br />ANALYSIS <br />The preliminary estimated costs associated with this project are as <br />follows: <br />Engineering $14,620.00 <br />Construction 70,000.00± <br />Total Project Cost $84,620.00± <br />September 20, 1994 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.