Laserfiche WebLink
SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br />GENERAL CONDITIONS <br />SC -1:00 Introduction <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract <br />Documents as indicated. below. All provisions, which are not so amended or supplemented, <br />remain in full force and effect. <br />The terms used in these Supplementary Conditions will have the meanings indicated in the <br />General Conditions. <br />SC -1.01 Defined Terms <br />SC -1.01.A.20. Delete paragraph GC 1.01,A.20 in its entirety. <br />SC -1.02 Terminology <br />SC -1.02.D.1, 2, and 3 Delete paragraphs GC -1.02.D.1, 2, and 3 in their entirety and <br />insert the following paragraphs in their place: <br />D. Fumish, Install, Perform, Provide. <br />1. The word "furnish" shall mean to supply and deliver services, materials, or <br />equipment to the Site. (or some other specified location) ready for use or <br />installation and in usable or operable condition. <br />2. The word "install'' shall mean to put into use or place in final position services, <br />materials, or equipment complete and ready for intended use. <br />3. The words "perform" or "provide" shall mean to furnish and install services, <br />materials, or equipment complete and ready for intended use. <br />SC -2.05 Before Starting Construction <br />SC -2.05.C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its <br />place: <br />C. Evidence of Insurance: CONTRACTOR shall not commence work under this <br />Contract until he has obtained all insurance required under Article 5 and such <br />insurance has been delivered to the OWNER and approved by the OWNER, nor <br />shall the CONTRACTOR allow any Subcontractor to commence work on his <br />subcontract until all similar insurance required of the Subcontractor has been so. <br />obtained and approved. All such insurance shall remain in effect until final <br />payment and at all times thereafter when CONTRACTOR may be correcting, <br />removing or replacing defective Work in accordance with Article 13. <br />SC -2.06 Preconstruction Conference <br />SC -2.06 Delete paragraph GC-ZO6.A in its entirety and insert the following paragraph in its <br />place: <br />A; Immediately after awarding the contract, but before the CONTRACTOR begins <br />work, the Project Manager will call a preconstruction conference at a place the <br />ENGINEER designates to establish an understanding among the parties as to <br />the work and to discuss schedules referred to in paragraph 2.05.13, procedures <br />00800-1 <br />00800 - Supplementary Conditions -05-13 rev <br />00800 1 F:10.ubllc WorWENGINEERING DIVISION PROJECTMI736 IRC Healy Department Roof Replacament ProJectll-AdminlBld DocumentsWaster Contract <br />Documents=800 - Supplementary Conditions Oli-13 rev:doc <br />