My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for handling Shop Drawings and other submittals, and maintaining required <br />records. Utility companies and others as appropriate will be requested to attend [. <br />to discuss and coordinate work. <br />B. The Contractor will certify to the Engineer the following: �- <br />1. A listing of on-site clerical: staff, supervisory personnel and. their pro -rated <br />time assigned to the contract, <br />2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br />3. Existence of employee benefit plan for Holiday, Sick and Vacation ,benefits <br />and a Retirement. Plan, and, ! <br />4. Payment of Per Diem is a company practice for instances when ! <br />compensation for Per Diem is requested. <br />Such certification must. be made by an officer or director of the Contractor with <br />authority to bind the Contractor. Timely certification is a condition precedent to <br />any right of the Contractor to recover compensations for such costs, and failure <br />to timely submit the certification will constitute a full, complete, absolute and <br />irrevocable waiver by the Contractor of any right to recover such costs. Any <br />subsequent changes shall be certified to the Engineer as part of the cost <br />proposal or seven calendar days in advance of performing such extra work. <br />FDOT Table <br />4-3.2.1 <br />Item <br />Rate <br />FICA <br />Rate established by Law <br />...... ._.._.........FUTNSUTA ............... ___ <br />Rate established b ..Law <br />Medical Insurance <br />Actual <br />Holidays, Sick & Vacation Benefits <br />Actual <br />Retirement Benefits <br />Actual <br />Workers Compensation <br />Rates based on the National Council on <br />Compensatiori Insurance basic rates tables <br />adjusted by Contractor's actual experience <br />modification factor in effect at the time of the <br />additional work or unforeseen work <br />Per Diem <br />Actual but not to exceed State of Florida's rate <br />Insurance* <br />Actual <br />*Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br />insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3:05: <br />SC -3.06 <br />Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. <br />Written Interpretations <br />2. <br />Addenda <br />3. <br />Specifications <br />4. <br />Supplementary. Conditions to the General Conditions <br />5. <br />General Conditions <br />6. <br />-Approved Shop Drawings <br />7. <br />Drawings <br />.8. <br />Referenced Standards. <br />B. Written/computed dimensions shall govem over scaled dimensions. <br />00800-2 <br />00800 - Supplementary Conditions 05.4.1rev <br />00800 21FAllublIc WorkstENGINEERING DIVISION PROJECTSM36 IRC Health Department Roof Replacement Project\'I-Admin0d DewmentsWlaster Contrail <br />Documents100860 - Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.