Laserfiche WebLink
A. City/County building permit application -Permit no. XXXXXXXXX <br />2. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. - The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />3. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GG -11.01.A.1 in its entirety, and insert the following sentences <br />in its place: <br />1. <br />SC -13.03 <br />CONTRACTOR will receive payment for actual costs of direct labor and burden <br />(see SC -2.06.13) for the additional or unforeseen work. Labor includes foremen` <br />actually engaged in the work; and will not include project supervisory ry personnel nor <br />necessary on-site clerical staff, except when the additional or unforeseen work is a <br />controlling work item and the performance of such controlling work item actually <br />extends completion of the project due to no fault of the Contractor. Compensation <br />for project supervisory personnel, but in no case higher than a Project Manager's <br />position, shall only be for the pro -rata time such supervisory personnel. spent on <br />..... the contract._ to no„case ... hall. an officer or director of the Company, nor those <br />persons who own more than 1% of the Company, be considered as project } <br />supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal l <br />holidays, shall be included in the above to the extent authorized by OWNER. <br />Test and Inspections <br />SC -13.03.B. Delete paragraph GG -13.03.B in its entirety, and insert the following sentences in <br />its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br />applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />following inspections, tests, or approvals: <br />1. inspections,. tests, or approvals covered by paragraphs 13.03.0 and 13.03.1) <br />below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to <br />paragraph 13.04.6 shall be paid as provided in said paragraph 13.04.13; <br />3. tests otherwise specifically. provided in the Contract Documents. <br />SC -13.06 OWNER May Stop the Work <br />00800-7 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 7F:,Puhlic WorkstENGINFERING DIVISION PROdECTSH736 IRC Health Department Roof Replacement Projectll-AdminlBld.DpcumentsWaster Contract <br />.. Documents\00800 - Supplementary Conditlons 05-13 rev.doc - - <br />