My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
................. <br />........... ._* ....... <br />3.05.A13.05.A in its entirety and.insert the following paragraph in its <br />-1 . Delete paragraph GC, <br />SC <br />place: <br />A. if the Work is defective, or CONTRACTOR'fails. to supply sufficient skilled <br />workers or suitable materials or equipment, or fails to comply with, permit <br />requirements, orfails to comply with the technical -specifications, � or fails to <br />. <br />perform the Work in such a way that the completed Work will conform to the <br />Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br />portion thereof, until the cause for such order has been eliminated; however, this <br />right of OWNER to stop the Work shall not.give rise to any duty on the part of <br />OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or IF <br />employee or agent of any of them. <br />SC -13.07 Correction Period <br />SC -13.07 A. Delete the first sentence of paragraph GC -13.07.A in its entirety and insert the <br />following sentence in its place <br />A. If within one year after the date of Final Completion or such longer period of time <br />as may be prescribed by Laws or Regulations or by the terms of any applicable <br />special guarantee required by the Contract Documents or by any specific provision <br />p <br />. ...... ......... ......... of .the Contract. Documents, an Work Is found to be defective, or if the repair of <br />Documents, ..... ... 'y ... . ... ...... ............. ..... .......available <br />fdtCONTRACTORsuse-by- <br />any damages to the land or areas made <br />OWNER or permitted by Laws and Regulations as contemplated in paragraph <br />6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to <br />OWNER and in 'accordance with OWNERs written instructions: (i) repair such <br />defective land or areas, or (ii) correct such defective Work or, if the defective Work <br />has been rejected by OWNER, remove it from the Project and replace it with Work <br />that is not defective, and (III) satisfactorily correct or repair or remove and replace <br />any damage to other Work, to the work of others or other land or areas resulting <br />therefrom. <br />SC -13.07 B. Delete paragraph GC -13.07.B in its entirely. and insert the following sentence in its <br />place <br />B. In special circumstances where a particular item of equipment is placed in continu- <br />ous service before Final Completion of all the Work, the correction period for that <br />Rem may start to run from an earlier date if so provided in the Specifications or by <br />Written Amendment. <br />00800-8 -13 rev <br />00800 - Supplementary06nditions 05 <br />0080.0 Bp - <br />%public WorksXE14GINEERINGOIVISION PROJECTSM36 IRC Health Department Root Replacement projectlI.Admin%tild DocumentsWilstot Contract <br />D . oN.Ments%0080.6 - supplementary Conditions 65-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.