My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X X: <br />SECTION 0125 00 <br />PRODUCT SUBSTITUTIONS <br />PART I GENERAL <br />1.01 SECTION INCLUDES <br />A. This Section specifies administrative and procedural requirements for handling, requests <br />for substitutions prior to the Owner's receipt of bids. <br />1.02 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Specification Sections, apply to this Section. <br />1.03 DEFINITIONS <br />A. Definitions used in this Article are not intended to change or modify the meaning of other <br />terms* used in the'Contract Documents. <br />B. Substitutions: Requests for changes in products, materials, and equipment, of <br />construction required by Contract Documents proposed by the Contractor are considered <br />requests for "substitutions". The following are not considered substitutions: <br />1. Substitutions that are requested by Bidders beyond the 14 days prior to bid <br />opening submittal period. <br />-2. Revisions to Contract Documents requested by the Owner or Engineer. <br />3. Specified options of products and construction methods included in Contract <br />Documents. <br />4. The Contractor's determination- of and compliance with governing regulations <br />and orders issued by governing authorities. <br />1.04 SUBMITTALS — PRIOR TO BED <br />A. Substitution Request Submittal: Written requests for substitution from prime bidders will <br />be considered if received by the Engineer fourteen (14) calendar days prior to the bid <br />opening. <br />1. Submit each request for substitution to purchasing@iregov.com on the form <br />contained in Section 00 63 25 -Substitution Request Form for consideration in <br />accordance with procedures required below. <br />2. Identify the product or the fabrication or installation method to be replaced in <br />each request. Include related specification sections and drawing number. <br />3. Provide complete documentation on both the product specified and the proposed <br />substitution including the following information as appropriate. <br />a. Comparison of specified and proposed substitute product data, <br />fabrication drawings, and installation procedures. <br />b. Samples where applicable or requested. <br />C. A detailed comparison of significant qualities of the proposed <br />substitution with those of the work specified. <br />Indian River* County Health Department <br />Roof Replacement & Exterior Repair 012500-1 Product Substitutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.