My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0. <br />2.61 <br />A. <br />r. <br />B. <br />2.02 <br />A. <br />PART 3 <br />SUBSTITUTIONS —PRIOR TO BID <br />Conditions: The Contractor's substitution request will be received and considered by the <br />Engineer when all of the following conditions are satisfied, as determined by the <br />Engineer; otherwise requests will be returned without action except to record <br />noncompliance with these requirements. <br />1. Extensive revisions to Contract Documents are not required <br />2. Proposed changes are in keeping with the general intent of Contract Documents. <br />3: The request is timely, fully documented and properly submitted. <br />4. The request is directly related to an "or equal" clause or similar language in the <br />Contract Documents. <br />The Contractor's submittal and Engineer's acceptance of Shop Drawings, Product Data <br />or Samples that relate to construction activities not complying with the Contract <br />Documents does not constitute an approval or valid request for substitution. <br />SUBSTITUTIONS — AFTER AWARD OF CONTRACT <br />Substitutions after award are solely for the convenience of the Contractor, and Engineer <br />nor Owner is under any. obligation to review or approve proposed substitutions. <br />Substitutions that are approved by the Engineer, will be done by Change Order which is <br />accompanied by a credit to the Owner. The Contractor shall be required to bear any <br />additional costs related to making the substituted material or system work, such as extra <br />engineering, material or system modifications, or any time considerations relating to <br />material or system installation requirements.. <br />EXECUTION (NOT USED) <br />END OF SECTION 0125 00 <br />Indian River County Health Department <br />Roof Replacement & Exterior Repair <br />012500-3 Product Substitutions <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.