My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-044A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:05:14 PM
Creation date
3/12/2018 11:10:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/06/2018
Control Number
2018-044A
Agenda Item Number
8.J.
Entity Name
Advanced Roofing
Subject
Health Department Roof Replacement and Exterior Repair
Project Number
IRC-1736
Bid Number
2018013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ing, reporting, and communication incidental to provisions of the warranty pro- <br />cedures. <br />4. Inclement Weather <br />a. In the event of temporary suspension of work as during inclement weath- <br />er, or whenever the Engineer shall direct, the Contractor will protect <br />carefully its work and materials against damage or injury from weather. <br />If, in the opinion of the Engineer, any work or materials have been dam- <br />aged or injured by reason of failure of the Contractor to protect its work, <br />such materials shall be removed and replaced at the expense of the Con- <br />tractor. <br />b. During inclement weather. and temporary suspension of work, the Con- <br />tractor shall inspect the facility no later than 9:00 AM each day for leaks <br />and perform temporary repairs if necessary. Inspections shall be made <br />daily during extended periods of inclement weather. Upon arrival at the <br />facility, Superintendent shall immediately inform the Owner of his pres- <br />ence and purpose. <br />C. If Contractor does not inspect the facility by 9:00 AM on days of inclem- <br />ent weather and there are one or more leaks attributable to the Work, -at <br />9:15 AM the Owner shall exercise his right to contact an outside contrac- <br />tor to perform temporary repairs as necessary to prevent damage to the <br />building, its contents and to minimize disruption. The Contractor shall <br />reimburse the outside contractor an equitable amount as determined sole- <br />ly by the outside contractor. If the Contractor arrives at the project site <br />after the outside contractor has been contacted, but before temporary re- <br />pairs are made, the outside contractor shall be reimbursed the fixed <br />amount of $500.00, each occasion, for mobilization and/or travel expens- <br />es. <br />d. Should inclement weather occur after normal business hours Friday, Sat- <br />urday, and Sunday or holidays, Contractor shall make arrangements with <br />the Owner to provide access to the building to inspect for leaks. The <br />Owner shall be compensated for providing personnel for the service on <br />an hourly rate basis as determined solely by the Owner. <br />D. Manufacturer's Field Services: During construction and until substantial comple- <br />tion, manufacturer's representative shall perform -quality assurance site visits every <br />ten working days to ensure materials are being properly installed and as required to <br />obtain the specified warranty. <br />1. The first site visit shall be performed within the first three (3) days of operations. <br />2. Coordinate all site visits with Engineer. Submit reports of findings within one <br />week of inspection. Payment applications will be rejected until applicable re- . <br />ports are received. <br />3. Inspections to be performed by an employee of the selected manufacturer that is <br />assigned full time to their technical services department. Sales personnel will not <br />be acceptable for this function and may result in rejection of the work installed <br />that does not fulfill this requirement. <br />4. Manufacturer's final inspections shall be performed only with REI personnel in <br />attendance. A minimum of seven days' written notice is required. Any manufac- <br />turer's final inspection conducted without REI personnel in attendance will be <br />repeated at no additional cost to the Owner. <br />5. Any violation of this requirement will result in the removal of that manufacturer <br />for a period of not less than one year from the. Engineer's accepted materials list. <br />Indian River County Health Department <br />Roof Replacement & Exterior Repair 014000-5 Quality Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.