Laserfiche WebLink
C. If ENGINEER does not render a formal <br />2. Cost of all 'materials and equipment <br />l' <br />decision in writing within the time stated in paragraph <br />furnished and incorporated in the Work, includ- <br />�« <br />10.05.13, a decision denying the Claim in its entirety <br />Ing costs of transportation and storage thereof, <br />shall be deemed to have been issued 31 days after <br />and Suppliers' field services required in <br />receiptof the last submittal of the claimant or the last <br />connection therewith. All cash discounts shall <br />submittal of the opposing party, if any. <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />�\ <br />D. No Claim for an adjustment in Contract Price <br />to make payments, in which case the cash <br />' == <br />or Contract Times (or Milestones) will be valid if not <br />discounts, shall accrue to OWNER. All trade- <br />submitted in accordance with this paragraph 10.05. <br />discounts, rebates ,and refunds .and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />ARTICLE 11 - COST OF THE WORK; CASH <br />shall make provisions so that they may be <br />ALLOWANCES; UNIT PRICE WORK <br />obtained. <br />3. Payments made by CONTRACTOR <br />11.01 Cost of the Work <br />, <br />to Subcontractors for Work performed . by <br />Subcontractors. If required by OWNER, CON- <br />C <br />A. Costs Included: The term Cost of the Work <br />TRACTOR shall obtain competitive bids from <br />means the sum of all costs necessarily incurred and <br />subcontractors acceptable to OWNER and <br />paid by CONTRACTOR in the proper performance of <br />CONTRACTOR and shall deliver such bids to <br />i== <br />the Work. When the value of any Work covered by a <br />OWNER, who will then determine, with the <br />Change Order or when a Claim for an adjustment in <br />advice of ENGINEER, which bids, if any, will be <br />Contract Price is determined on the basis of Cost of <br />acceptable. If any subcontract provides that the <br />the Work, the costs to be - reimbursed to <br />Subcontractor is to bep aid on the basis of Cost-_-._.- <br />CONTRACTOR will be only those additional or <br />of the Work plus a fee, the Subcontractor's <br />incremental costs required because of the change in <br />Cost of the Work and fee shall be determined <br />the Work or because of the event giving rise to the <br />in the same manner as CONTRACTOR's Cost <br />Claim. Except as otherwise may be agreed to in <br />of the Work and fee as provided in this para- <br />writing by OWNER, such costs shall be in amounts no <br />graph 11.01. <br />higher than those prevailing in the locality of the <br />Project, shall include only the following items, and <br />4. Costs of special consultants <br />shall not include any of the costs itemized in para- <br />(including but not limited to engineers, <br />graph 11.01.13. <br />architects, testing laboratories, surveyors, <br />j <br />attorneys, and accountants) employed for <br />4. PaYFGII GGStS f9F employees 'A the <br />dir,oGt employ of GONTRACTOR in the <br />services specifically related to the Work. <br />peFfGF- <br />5. Supplemental costs including the <br />GONTRAGTOR. Such employees shall inolude <br />following: <br />, <br />a. The proportion of necessary trans- <br />and 4341118F peFsennel employed full time at the <br />travel, and subsistence expenses of <br />Site. PayFell ooStS fQF employees not employed <br />CONTRACTOR's employees incurred in dis- <br />the basis ef theiF time spent 9R the Work. <br />charge of duties connected with the Work. <br />3 <br />Payroll Ggsts shall iRGlude, but not be , <br />b. Cost, including transportation and <br />salaFier, and wages plus the Gast of fr4np <br />maintenance, of all materials, supplies, equip- , <br />ment, machinery, appliances, office, and <br />temporary facilities at the Site, and hand tools <br />' eampeRsation, h <br />not owned by the workers, which are consumed <br />In the performance of the Work, and cost, less <br />vasati <br />market value, of such items used but not con- <br />sumed which remain the property of CON-. <br />legal holidays, shall be inGluded theabeve-49 <br />TRACTOR. <br />00700-32 <br />00700 -General 0onditions Master <br />F:1Public WoeaWNGINEFRING DIVISION PROJECTS11736 IRC Health Department Roof Replacement Projeclll-Admin0a Dowments\Masler Contract Documanl9100700 -General <br />Conditions Mesterdoc :. <br />