Laserfiche WebLink
..:•:,:?;•:-r:-:�x�;:,... ...-_ .—.... I .... ....... ..:...... ......... .. c=_r:: ::•::=: >: •. :;= ::;;::_:: ::: .... - - .. -: <br />J_. t.:.: <br />=t <br />I.. <br />C. Rentals of all construction equip-. <br />ment and machinery, and the parts thereof <br />whether rented from CONTRACTOR or others <br />in accordance with rental agreements approved <br />by OWNER with the advice of ENGINEER, and <br />the costs of transportation, loading, unloading, <br />assembly, dismantling, and removal thereof. <br />All such costs shall be in accordance with the <br />terms of said rental agreements. The rental of <br />any such equipment, machinery, or parts shall <br />cease when the use thereof is no longer <br />changes in the Work .or .caused by the event <br />giving rise to the Claim. <br />j, When all the Work. is performed on the <br />basis of cost-plus, the costs of premiums for all <br />Bonds and insurance CONTRACTOR is <br />required by the Contract Documents to <br />purchase and maintain. <br />B. Costs Excluded. The term Cost of -the Work <br />shall not include any.of the following items: <br />necessary for the Work.= <br />. <br />1. Payroll costs and other compensation <br />d. Sales, consumer, use, and other <br />of CONTRACTOR's officers, executives, princi- <br />(of and sole proprietorships), <br />similar taxes related to the Work, and for which <br />CONTRACTOR is liable, imposed by Laws and <br />pals partnerships <br />general managers, engineers, architects, <br />Regulations. <br />estimators, attorneys, auditors, accountants, <br />and contracting agents, expediters, �== <br />g 1=. <br />e . Deposits lost for causes other than <br />purchasing <br />p <br />timekeepers, clerks, and other personnel C_ <br />employed by CONTRACTOR, whether at the <br />negligence of CONTRACTOR, any Sub- <br />directly or indirectly <br />Site or in CONTRACTOR's principal or branch <br />contractor, or anyone <br />employed by any of them or for whose acts any <br />office for general administration of the Work <br />of them may be liable, and royalty payments <br />and not specifically included in the agreed upon i <br />tions referred to in <br />schedule of job classifications <br />and fees-for-permits.and_licenses..,-__ --- <br />y---- <br />-paragraph 11:01:A:1 or specifically covered- by---------- <br />f. Losses and damages (and related <br />t <br />paragraph 11.01.A.4, all of which are to be I. <br />administrative costs covered by the <br />expenses) caused by damage to the Work, riot <br />considered' <br />CONTRACTOR's fee. <br />compensated by insurance or otherwise, sus- <br />h <br />tained by CONTRACTOR In connec on <br />the performance of the Work (except losses <br />and damages within the deductible amounts of <br />property insurance established in accordance <br />with paragraph 5.06.1)), provided such losses <br />and damages have resulted from causes other <br />than the negligence of CONTRACTOR, any <br />Subcontractor, or anyone directly or indirectly <br />employed. by any of them: or for whose acts any <br />of them may be liable. Such losses shall <br />include settlements made with the written <br />consent and approval of OWNER. No such <br />losses, damages, and expenses shall be <br />included in the Cost of the Work for the <br />purpose of determining CONTRACTOR's fee. <br />g. The cost of utilities, fuel, and sanitary <br />facilities at the Site. <br />h. Minor expenses such as telegrams, <br />long distance telephone calls, telephone service <br />at the Site, expressage, and similar petty cash <br />items in connection with the Work., <br />i. When the Cost of the Work is used to <br />determine the value of a Change Order or of a <br />Claim, the cost of premiums for additional <br />Bonds and insurance required because of the <br />2. Expenses of CONTRACTOR's princi- <br />pal and branch offices other than <br />CONTRACTOR's office at the Site. . <br />3. Any part of CONTRACTOR's capital <br />expenses, including . interest on <br />CONTRACTOR's capital employed for the <br />Work and charges against CONTRACTOR for <br />delinquent payments. <br />4. Costs due to the negligence of CON- <br />TRACTOR, any Subcontractor, or anyone <br />directly or indirectly employed by any of them or <br />for whose acts any of them may be liable, <br />including but not limited to, the correction of <br />defective Work, disposal of materials or <br />equipment wrongly supplied, and making good <br />any. damage to property. <br />5. Other overhead or general expense <br />costs of any kind and the costs of any item not <br />specifically and expressly included in <br />paragraphs 11.01.A and 11.01.B. <br />. C. CONTRACTOR's Fee: When all the Work is <br />performed on the basis of cost-plus, CONTRACTOR's <br />fee shall be determined as set forth in the Agreement: <br />When the value of any Work covered by a Change <br />00700 - General Conditions Master <br />00700 - 33 -'- <br />F:1Pubtic Works\ENGINEERING DIVISION PRGJECTSN736 IRC Health Department Roof Replacement ProJedll-Admin\Bid Documents\Master CoMroct Docunten1s100700 -General <br />Conditions Masterdoc, <br />