My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-038A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:43:43 PM
Creation date
3/15/2018 11:23:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2018
Control Number
2018-038A
Agenda Item Number
8.S.
Entity Name
Johnson-Davis, Inc.
Subject
Culvert Replacement
Area
74th Avenue and 1st Street SW
Project Number
1737
Bid Number
2018024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br />UTILITIES <br />AT&T <br />Florida Gas Transmission <br />Indian River Farms Water Control District <br />OTHER ISSUES <br />• The Notice to Proceed tentative issuance is February 26, 2018. <br />• Maintenance of Traffic: <br />o Contractor shall submit a Maintenance of Traffic Plan to the Traffic Division for <br />approval. <br />o The Maintenance of Traffic Plan shall meet the FDOT Index 600, 2017 edition <br />o At a minimum, one-way traffic shall be available at all times. <br />• The 120" CSP shall be either on site prior to installation or secured in the Contractor's <br />company yard so as to avoid theft or vandalism of the pipe. <br />• The Contractor shall strictly adhere to the requirements of Indian River Farms Water Control <br />District permit. <br />• Blockage of flow in the Sub -Lateral C-2 or Lateral C Canal is strictly prohibited. <br />• Embankment material. Payment for material will be lump sum. <br />• Excavation —to be removed and disposed of by Contractor. This material may be utilized on <br />site if deemed suitable. <br />• PERMITS — Conditional Indian River Farms Water Control District, Permit No. 17-33 has <br />been issued and will be part of Addendum No. 1. <br />DISCUSSION <br />• Review and comment with questions and clarifications is extended to Monday, January 22, <br />2018 at 8:00 AM. <br />• The construction should be.performed around any rainfall and subsequent drainage of the <br />basin to the west of the project location. This drainage basin flows to the Sub -Lateral C-2 <br />and Lateral C Canals and the work to be performed shall not interfere with the runoff in the <br />canals and the runoff can not cause any problems with construction. <br />• The Maintenance of Traffic Plan must be submitted prior to construction. <br />• Concerns were made for providing an itemized cost proposal. <br />• Sheet piling is listed on the Quantities Plan Sheet. <br />• A concern of a bid bond being required was raised. It was explained that a bid bond will not <br />be required. <br />• A concern of an AT&T conduit within the project area and have they been contacted. It was <br />explained that AT&T was contacted however, no direction/status of their facilities was <br />provided. <br />• Three copies of the proposal are required to be submitted. <br />• Construction over the gas line shall conform to Florida Gas Transmission specifications. <br />• A concern was raised regarding the type of pipe spec. It was explained that clarification <br />would be part of Addendum No. 1 <br />• Meeting adjourned at 2:20 PM. <br />F:\Public WorksTNGINEERING DIVISION PROJECTS\1737 7416 Ave and 1st SW Culvert Rep] acement\4-Construction"Nicetings\Pre- <br />Solicitation\1737 Pre -Solicitation Conference Minutes 20180116.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.