Page 2 of 2 <br />UTILITIES <br />AT&T <br />Florida Gas Transmission <br />Indian River Farms Water Control District <br />OTHER ISSUES <br />• The Notice to Proceed tentative issuance is February 26, 2018. <br />• Maintenance of Traffic: <br />o Contractor shall submit a Maintenance of Traffic Plan to the Traffic Division for <br />approval. <br />o The Maintenance of Traffic Plan shall meet the FDOT Index 600, 2017 edition <br />o At a minimum, one-way traffic shall be available at all times. <br />• The 120" CSP shall be either on site prior to installation or secured in the Contractor's <br />company yard so as to avoid theft or vandalism of the pipe. <br />• The Contractor shall strictly adhere to the requirements of Indian River Farms Water Control <br />District permit. <br />• Blockage of flow in the Sub -Lateral C-2 or Lateral C Canal is strictly prohibited. <br />• Embankment material. Payment for material will be lump sum. <br />• Excavation —to be removed and disposed of by Contractor. This material may be utilized on <br />site if deemed suitable. <br />• PERMITS — Conditional Indian River Farms Water Control District, Permit No. 17-33 has <br />been issued and will be part of Addendum No. 1. <br />DISCUSSION <br />• Review and comment with questions and clarifications is extended to Monday, January 22, <br />2018 at 8:00 AM. <br />• The construction should be.performed around any rainfall and subsequent drainage of the <br />basin to the west of the project location. This drainage basin flows to the Sub -Lateral C-2 <br />and Lateral C Canals and the work to be performed shall not interfere with the runoff in the <br />canals and the runoff can not cause any problems with construction. <br />• The Maintenance of Traffic Plan must be submitted prior to construction. <br />• Concerns were made for providing an itemized cost proposal. <br />• Sheet piling is listed on the Quantities Plan Sheet. <br />• A concern of a bid bond being required was raised. It was explained that a bid bond will not <br />be required. <br />• A concern of an AT&T conduit within the project area and have they been contacted. It was <br />explained that AT&T was contacted however, no direction/status of their facilities was <br />provided. <br />• Three copies of the proposal are required to be submitted. <br />• Construction over the gas line shall conform to Florida Gas Transmission specifications. <br />• A concern was raised regarding the type of pipe spec. It was explained that clarification <br />would be part of Addendum No. 1 <br />• Meeting adjourned at 2:20 PM. <br />F:\Public WorksTNGINEERING DIVISION PROJECTS\1737 7416 Ave and 1st SW Culvert Rep] acement\4-Construction"Nicetings\Pre- <br />Solicitation\1737 Pre -Solicitation Conference Minutes 20180116.doc <br />