My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/23/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:23:06 PM
Creation date
3/16/2018 4:14:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/23/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) PHASE 4-100% CONSTRUCTION DOCUMENTS <br />1. The CONSULTANT will further develop the 50% constriction documents for permitting <br />and bidding purposes. <br />2.The CONSULTANT shall Design and RLepare a co m Tete set of construction plans for <br />the. building suitable for obtaining County Site Plan Approval Building Permits and <br />Health Department permits. and other Hermits required for the work. The design shall be <br />in accordance with the 2014 Florida Buildin Code and currcnt Life Safety Code. These <br />plans shall include: <br />(i) Architectural <br />(ii) Mechanical <br />(iii) Electrical <br />(iv) Fire protection systems <br />(v) Security systems <br />(vi) Information technology systems <br />a. Security Muirements and coordination <br />b.Voice and data systems <br />(vii) Energy Code Calculations/ model ing per Florida Building Code (F B C L <br />(e) PHASE 5 -BIDDING AND PERMIT <br />I. In general, the CONSULTANT will assist the COUNTY with bid procurement <br />including assistance in the preparation of procurement documents and information <br />for General Contractor hard bid delivery system. <br />Scrvices may include: <br />(i) Description of time, place and conditions of bidding and construction. <br />(ii) Bidding and Proposal forms <br />(iii) Form of Agreement - between owner and contractor. <br />(iv) Conditions of the Contract -standard, supplementary, and other special <br />conditions. <br />2. The CONSULTANT will assist the COUNTY with Construction <br />Procurement services, including: <br />(i) Prepare and provide bid sets for general contractor use in securing <br />bids. <br />(ii) Coordinate and attend meetings and negotiations with the perspective <br />Contractors and sub -contractors. Respond to Requests for Information (RFI'sl <br />sent by bidders, and prepare Addendums and plan modifications, if necessary. <br />(iii) Bid validation. <br />(iv) Prepare Notice of Award and assist IRC in finalizing construction <br />contract. <br />3. Building permits: Assist contractor with the building permit review process. <br />Provide plans, specifications and supporting documentation. Prepare response to <br />6 <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.