My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/23/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:23:06 PM
Creation date
3/16/2018 4:14:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/23/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building official review and necessary plan modifications. (Note: This is completed <br />before bidding and construction contract award.) <br />(f) PHASE 6 -CONSTRUCTION PHASE: <br />1. The CONSULTANT shall assist the COUNTY with the Contract <br />Administration including: attend progress meetings, review shop drawings and <br />contractors submittals, and provide routine site observations to verify the work is <br />proceeding in accordance with the plans and specifications for the purposes of <br />certification upon completion ofthe work. Observations shall be documented with <br />written reports and digital photographs. The CONSULTANT will coordinate the <br />responsibility for document review, meeting attendance, and observations with <br />architect and other consultants. The construction period is estimated to be ten (10) <br />to twelve (12)months, Construction Administration and observation fees have been <br />estimated by the CONSULTANT based on this time frame, and the tasks and <br />frequency of services listed below. Anticipated tasks and services include: <br />(i) Building: <br />a. Coordinate and attend pre -construction meetings. (2) <br />b. Attend progress meeting with contractor (1 /wk.) <br />C. Review shop drawings (1 submittal) <br />d. Review contractors pay requests (1 /month) <br />e. Periodic observations ofthe bldg. construction (I+ -]wk-) <br />f. Observations from M.E.P. (spell out MEP) Consultants as <br />needed <br />g. Substantial completion observations punch list (1) <br />h. Final observation Ifinal completion determination (1) <br />(ii) Changes to Work: Oversee changes to work, field directives, and <br />minor plan changes, administer construction change orders. <br />SECTION V - TIME FOR COMPLETION <br />(1) The time for completion of each project phase shall be as follows: <br />(a) Agreement between the CONSULTANT and the COUNTY- 30 days <br />(b) Phase One -Programming, Schematic Design Phase- 45 days <br />(c) Phase Two -Design Development Phase- 45 days <br />(d) Phase Three -50% Construction Documents- 45 days <br />(e) Phase Four- 100% Construction Documents -45 days <br />(f) Phase Five- Bidding and Permit- 60 days <br />(g) Phase Six -Construction Administration- ten (10) to twelve (12) months <br />(h) Occupy Facility - <br />TBD <br />(2) Commencement dates shall be established in a "Notice to Proceed" from the COUNTY <br />for each phase. <br />7 <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.