My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/23/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:23:06 PM
Creation date
3/16/2018 4:14:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/23/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />1801 27'x' Street, Vero Beach, FL 32960-3388 <br />January 16, 2018 <br />Indian River Lagoon National Estuary Program (FY 2018-2019) <br />Category 1: Restoration Project <br />Subject: Letter of Intent to apply for a restoration projects grant for the West Wabasso Phase II Septic to <br />Sewer Project <br />Dear Mr. Frank Sakuma, <br />Indian River County Department of Utility Services (IRCDUS) is pleased to submit a letter of intent for the <br />above mentioned project to be considered for funding for Fiscal Year 2018-2019 under the Indian River <br />Lagoon National Estuary Program (IRLNEP). <br />Requesting Organization Name and Contact Information for Project Lead <br />Requesting Entity/Organization <br />Project Manager: <br />Email Address: <br />Phone: <br />Participating Organizations or Institutions <br />Indian River County <br />Department of Utility Services (IRCDUS) <br />Arjuna Weragoda, P.E. <br />aweragoda@ircgov.com <br />772-226-1821 <br />Potential: St. Johns River Water Management District (SJRWMD) <br />Florida Legislature <br />Summary of the Project and its Benefits to the Indian River Lagoon <br />The project proposes to construct a new 8" Gravity Sewer Collection System within The Whitfield <br />Subdivision of West Wabasso. The Project design is 100% complete (shovel ready), and the Project has <br />secured the following agency permits: <br />Florida Department of Environmental Protection (FDEP) Wastewater Collection Permit <br />Indian River County (IRC) Right-of-way Permit <br />Benefit of constructing a public sewer system include not only the removal and cleanup of numerous <br />existing and antiquated septic systems but also the prevention of additional new systems. These septic <br />systems can leach nutrients into groundwater, contaminating the Indian River Lagoon (IRL) when it merges <br />with the estuary's base flow (where the underground water table meets the sea surface). Another benefit <br />71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.