Laserfiche WebLink
Fiscal Year 2018-2019 IRLNEP <br />West Wabasso Phase II Septic to Sewer Project <br />is preventing stormwater pollution from leaching from topsoil's into estuarine water during major rain <br />events. The project would yield a positive benefit to the Lagoon by reducing an estimated amount of <br />3,131 pounds/year of total nitrogen and 505 pounds/year pounds of total phosphorus from being leached <br />into the Lagoon. <br />This project supports the adopted Central IRL Basin Management Action Plan (BMAP), the allocated Total <br />Maximum Daily Load (TMDL), the Surface Water Improvement and Management (SWIM) Plan and IRL <br />Comprehensive Conservation and Management Plan (CCMP). It directly supports the effort to achieve <br />total nitrogen and total phosphorus required reductions set forth for the County in the Central IRL BMAP. <br />It supports the IRLNEP economic study (Hazen and Sawyer, P.C., 2008) that estimates the total value of <br />the lagoon's benefits to residents and visitors was estimated at $3.725 billion. It further supports the <br />action plans put forth in the Indian River Lagoon National Estuary Program Comprehensive Conservation <br />& Management Plan (2012). Finally, it supports the SWIM Plan (2002) that conducted surveys in all the <br />IRL basins and concluded in general that the soils were not suitable for onsite sewage treatment disposal <br />systems (OSTDS), particularly at densities of two or more units per acre. <br />Project Fundin>; <br />The West Wabasso Phase II septic to sewer project will convert approximately fifty seven (57) existing <br />septic tanks to centralized sewer. The project will construct a gravity sewer system to service an area that <br />has a mixed land use designation of primarily residential and a few commercial properties on septic for a <br />total project cost of $2,250,984 and a construction cost of $2,100,000. As part of the project, sewer stub - <br />outs will be constructed to forty four (44) vacant parcels for future connection. The Indian River County <br />Board of County Commissioners on January 16, 2018, committed up to $1,000,000 of Indian River County <br />matching funds to support the successful completion of this project. The remainder $1.1 million will be <br />requested through the SJRWMD Cost -Share grant program and the Local Funding Initiative FY 18-19 <br />through the Florida Legislature. <br />Funding Requested through IRLNEP: $200,000.00 <br />We sincerely look forward to our project to be considered in the Fiscal Year 2018-2019 IRLNEP Funding <br />Program. If you have any questions or need any additional information to facilitate your decision please <br />do not hesitate to contact me at (772) 226-1821. <br />Sincerel , <br />Arjuna eragoda, P.E. <br />Capital Project Manager <br />\\fileserver2\public\Utilities\UTILITY - Engineering\Projects -Utility Construction Permits\IRC - West Wabasso Community Sewer System Phase <br />2 - UCP# 4117\Admin\Grants\IRLNEP\Letter of Intent West Wabasso Phase 11 S2S.docx <br />72 <br />