My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:55:33 PM
Creation date
3/21/2018 2:30:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2018 - <br />routing of the site plan application materials and prior to the datetheapplication is <br />selieduled, by the planning division to be eensidefed at a T -RG . TRC meeting <br />date at which the application is scheduled to be considered <br />Prior to each TRC meeting, the planning division shall conduct an inter- <br />departmental staff coordination meeting to coordinate draft comments and transmit <br />Post -coordination meeting draft comments to the applicant by email or similar <br />medium prior to the TRC meeting. The technical review committee shall consider each <br />application, shall complete a technical evaluation of the site plan application, and -shall <br />identify any deficiencies or discrepancies, and for each comment shall either indicate <br />that the comment involves a code, safety, or engineering requirement or that the <br />comment is advisory. Comments shall consist of the draft comments and items <br />discussed at the TRC meeting. Complete and final comments on all applications <br />considered at the TRC meeting shall be assembled and forwarded to the applicant within <br />four (4) working days. ^ p-phe tion At the discretion of the technical review <br />committee, applications with substantial deficiencies may, upon post -TRC re- <br />submittal, be rescheduled for re -review by heteehnieal ;=eviewLeoia*nit=tee tea e <br />diSO-etiOR 0at another technical review committee meeting. <br />(e) Resubmission, staff -level approval, and scheduling major site plans for planning and <br />zoning commission consideration. The applicant's response to the TRC comments shall <br />consist of five (5) revised plan sets, a traffic study if required by Chapter 952 <br />regulations, a concurrency certificate or evidence of application for a concurrency <br />certificate if required by Chapter 910 regulations, and an itemized letter that recites <br />each staff comment, details detailing how all of the diserepaneies have been adequate! <br />addressed_ each comment has been adequately addressed, and states where anv <br />corresponding plan revision can be located. Once all defieieneies comments have been <br />adequately addressed, all technical and informational requirements met, and the <br />commenting members of the TRC have recommended approval or approval with <br />conditions on the application, the application shall be approved by the community <br />development director or his designee if staff -level approval, or scheduled for <br />consideration before the planning and zoning commission if not staff level approval. <br />1. An applicant may request, at any time in the review process, that the application be <br />forwarded to the planning and zoning commission for consideration. Said request <br />shall be submitted to the planning division in writing and shall acknowledge that, in <br />staff s opinion, the application is not ready for consideration due to a lack of adequate <br />responses to staff and/or reviewing agency comments. <br />(f) Approval of minor site plans. The TRC is authorized to approve, approve with conditions <br />or deny minor site plan applications not requiring admi istr-ative pa.mit Planning and <br />Zoning Commission approval. Within seven (7) working days after the applicant submits <br />to staff a complete response to TRC comments (also known as a resubmittal), the county <br />shall either issue site plan approval or a dis epane , comment letter. Once all <br />commenting TRC members have reviewed and approved the applicant's responses to <br />comments, the minor site plan shall be signed and approved. All approved minor site <br />plans shall be signed by the community development director or his designee. Appeals ef <br />Bold Underline: Additions to Ordinance <br />ei-"�'hrOugh-: Deleted Text from Existing Ordinance <br />F:\Cotmnunity Development\CurDev\Ordinances\20180rdinances\2018- 914.06(1) and 914.06(5) - General thresholds and procedures for <br />site plan review and approval and 914.14(3) - General Submittal Requirements. docx <br />129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.