My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:55:33 PM
Creation date
3/21/2018 2:30:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2018- <br />(g) For all site plan applications that are not associated with a request involving a public <br />hearing but are required to be reviewed by the Planning and Zoning Commission, the <br />applicant shall submit the following along with his response to TRC comments and <br />revised site plans: <br />A separate document that verifies the duration of the required sign posting and <br />summarizes all contacts with the public. The summary shall, at a minimum, describe the <br />nature of contacts (e.g. from nearby resident, by phone), the types of comments received, <br />and changes to the project proposal (if any) based on comments received. <br />(h) Appeals of decisions made by the community development director or by the TRC <br />may be made by applicants pursuant to the provisions of Section 914.13. <br />SECTION #3: <br />Amend LDR Section 914.14 (3), "General submittal requirements"; as follows: <br />(3) General submittal requirements. <br />(a) Three (3) surveys meeting the minimum technical standards and containing the <br />information required in section 914.14(9), are required for major site plans, and may be <br />required by the community development director for minor site plans and administrative <br />approvals. <br />(b) Ten (1) plan sets containing all the information required in this section (914.14). If a <br />formal pre -application conference was held for the project, the applicant shall submit a <br />written response to each item in the project's pre -application conference discrepancy letter <br />or a written description of all revisions made to the project plans since the pre -application <br />conference review. <br />(c) A completed and signed site plan application form (furnished by the planning division). <br />(d) A completed and signed land clearing and tree removal permit application pursuant to <br />Chapter 927, or a completed acknowledgement form (furnished by the planning division) <br />stating that no tree removal and/or land clearing as defined in Chapter 927 is to take place <br />on-site. <br />(e) When applicable, a completed stormwater management application and two (2) copies of <br />the stormwater report pursuant to the requirements of Chapter 930. <br />(f) A landscape plan meeting the requirements of Chapter 926. <br />(g) A copy of the deed for the subject property. <br />(h) Written authorization from the property owner(s) if the applicant/agent is other than the <br />property owner(s). <br />(i) A concurrency certificate, or evidence of application for a concurrency certificate, or a <br />copy of the approved traffic methodology for the development project. <br />Bold Underline: Additions to Ordinance <br />et^ke throughi Deleted Text from Existing Ordinance <br />F:\Community Development\CurDev\Ordinances\20180rdinances\2018- 914.06(1) and 914.06(5) - General thresholds and procedures for <br />site plan review and approval and 914.14(3) - General Submittal Requirements.docx <br />130 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.