Laserfiche WebLink
W-14 TEMPORARY JUMPER DETAIL: Title block changed to read, "TEMPORARY JUMPER <br />DETAIL NOTES — CONTINUED FROM W-13". Note at top left of page "CONTINUED FROM W- <br />13". Renumber all notes. Revised Note 11 to read "THE CONTRACTOR SHALL PROVIDE <br />DOCUMENTATION DEMONSTRATING THAT THE REDUCED PRESSURE ZONE BACKFLOW <br />PREVENTOR (RPZ) IS IN GOOD WORKING ORDER AT THE TIME OF INSTALLATION, AND PROVIDE <br />DOCUMENTATION THAT THE RPZ HAS BEEN TESTED BY A QUALIFIED BACKFLOW TECHNICIAN <br />AS APPROVED BY IRCDUS. THE CONTRACTOR SHALL HAVE EACH RPZ TESTED PRIOR TO USE ON <br />EACH PROJECT". <br />R-1 REUSE METER/VALVE-ASSEMBLY DETAIL: In ELEVATION VIEW, eliminated the footer on <br />the concrete slab. <br />S-1 STANDARD LATERAL (SHALLOW SEWER): In the ELEVATION VIEW, add a curb detail to each <br />edge of the roadway. Add note "ETCH CURB'S' FOR SEWER LATERALS". The property lines <br />have been moved to better illustrate the sewer laterals terminating in the easement or right of <br />way and being the responsibility of IRCDUS. Added note "MARKER PAINTED GREEN". The <br />markers have been placed at the property line over the sewer lateral terminations. Added note <br />in the PLAN VIEW "COVER WITH DETECTION TAPE SEE NOTE 2". Added NOTE 6 "RISERS AND <br />CLEANOUT SHALL NOT BE CONSTRUCTED WITHIN 12" OF SIDEWALK". <br />S-2 MODIFIED RISER LATERAL (DEEP SEWER): In the ELEVATION VIEW, add a curb detail to <br />each edge of the roadway. Add note "ETCH CURB WITH 'S' FOR SEWER LATERALS". The <br />property lines have been moved to better illustrate the sewer lateral terminating in the <br />easement or right of way and being the responsibility of IRCDUS. The riser pipes have been <br />shown in a light pen weight. Add NOTE 4 "PLUMBING CONTRACTOR SHALL BE RESPONSIBLE <br />FOR RISER PIPE WITH BEND FOR SERVICE CONNECTION AND FOR SETTING 4" SEWER CLEANOUT <br />TO FINSHED GRADE PRIOR TO CONNECTION". Added NOTE 5, "RISERS AND CLEANOUT SHALL <br />NOT BE CONSTRUCTED WITHIN 12" OF SIDEWALK". <br />S-3 SEWER LATERAL RISER — DETAIL: In the ELEVATION VIEW, a sidewalk was added with a <br />note, a property line and a dimension of 12" minimum. The sewer lateral has been shown in a <br />light pen weight with a note to read "IRDCDUS RESPONSIBILITY". A phantom line and <br />"CUSTOMER RESPOSIBILITY" has been added to delineate construction responsibility. (Riser <br />pipes are the customer's responsibility.) Add NOTE, "PLUMBING CONTRACTOR RESPONSIBLE <br />FOR RISER PIPE & CLEAN OUT". <br />S-5 MANHOLE SPECIFICATIONS: All notes were revised, duplicate notes removed and <br />renumbered. Add NOTE 20, "ALL MANHOLES, LIFT STATION WET WELLS, VALVE VAULTS, <br />JOINTS, AND COURSES OF BRICK SHALL BE SEALED". <br />S-6 MANHOLE SLAB TOP: Add note "SEAL". (Seal to be used at the joint between manhole <br />body and top.) <br />S-7 MANHOLE SLAB TOP: Add note "SEAL". (Seal to be used at the joint between manhole <br />body and top.) <br />S-8 MANHOLE STANDARD DEEP: Add note "SEAL". (Seal to be used at the joint between <br />manhole sections, manhole body and top.) <br />163 <br />