S-13 FORCE MAIN TIE-IN: Add note "SEAL". (Seal to be used at the joint between manhole <br />body and top.) <br />5-14 TYPICAL WASTEWATER PUMPING STATION-WETWELL/VALVE VAULT PLAN VIEW: Add <br />note "LINER REQUIRED SEE 5-20 NOTE 30". Wet well depth/diameter chart has been removed. <br />See S-20. Add note to CONTROL PANEL "LOCATION OF CONTROL PANEL TO BE APPROVED BY <br />IRCDUS SEE 5-16 & S 17. TYPICAL PUPLEX PUMP CONTROL PANEL SEE 5-18 & S-19. TYPICAL <br />CONTROL PANEL NOTES 5-20". Add note "ALL HARDWARE SHALL BE 316 STAINLESS STEEL. SEE <br />5-20 FOR PUMP STATION GENERAL NOTES. SEE S-21 FOR PUMP STATION ELECTRICAL & <br />EMERGENCY GENERATOR NOTES". Add note "(3) schedule 80 PVC cable conduits 2"0 TO <br />CONTROL PANEL (ENTIRE LENGTH) FOR #1 PUMP LEAD, #2 PUMP LEAD & FLOAT SWITCH". Add <br />note "1" WATER SERVICE WITH REDUCED PRESSURE BACKFLOW PREVENTER AND HOSE BIBB <br />TO BE FILED LOCATED". <br />S-15 TYPICAL WASTEWATER PUMPING STATION-WETWELL/VALVE VAULT CROSS SECTION: <br />Add note "LINER REQUIRED (SEE S-20 NOTE 30)". Add note, "ALL HARDWARE SHALL BE 316 <br />STAINLESS STEEL. SEE 5-20 FOR PUMP STATION GENERAL NOTES. SEE S-21 FOR PUMP STATION <br />ELECTRICAL & EMERGENCY GENERATOR NOTES". Wet well depth/diameter chart has been <br />removed. Add note "%" PREFORMED JOINT MATERIAL TO BE PLACED BETWEEN PIPE AND <br />CONCRETE OR PIPE SLEEVE". The top of the valve vault has been lowered so that the concrete <br />apron surrounding vault is flush with wet well. Add note "SEAL" for wet well body and slab top. <br />Add note "SEAL" between wet well body sections. The pump(s) float switch, on/off elevations <br />have been revised for a more accurate depiction of the elevations required to prevent <br />cavitation. Add note, "RISER PIPE FLANGE SHALL HAVE LOCK WASHERS". <br />S-16 TYPICAL WASTEWATER PUMPING STATION -SITE PLAN: A data flow tower has been <br />added to each view. Add note "DATA FLOW TOWER TO BE APPROVED BY IRCDUS". Add note <br />to each view, "EMERGENCY GENERATOR, SEE NOTE 2, and SEE S-21 GENERATOR NOTES. Add <br />note to each view "REINFORCED CONCRETE SLAB 6" THICH (MINIMUM). FINISHED ELEVATION <br />OF PAD TO BE 4" ABOVE FINISHED GRADE ELEVATION". <br />S-17 TYPICAL WASTEWATER PUMPING STATION -ELECTRIC SERVICE ENTRANCE (METER/PANEL <br />BOX): New drawing, based in part on S-18 MARCH 2014. The drawing details the electrical <br />service specifications. It illustrates the conduits required, generator receptacle, meter can, etc. <br />5-18 TYPICAL WASTEWATER PUMPING STATION DUPLEX PUMP -ELECTRIC CONTROL PANEL <br />(BACK PANEL LAYOUT): New drawing that details the panel requirements. <br />5-19 TYPICAL WASTEWATER PUMPING STATION DUPLEX PUMP -ELECTRIC CONTROL PANEL <br />(INNER DOOR LAYOUT): New drawing that details the panel requirements. <br />5-20 TYPICAL WASTEWATER PUMPING STATION GENERAL NOTES: New drawing. All <br />wastewater pumping station notes were revised, duplicate notes removed, renumbered and <br />placed on a dedicated page. All wastewater pumping station drawings reference 5-20 and 5-21. <br />S-21 TYPICAL PUMPING STATION ELECTRICAL & GENERATOR NOTES: New drawing. PUMP <br />STATION ELECTRICAL NOTES are comprised of previous electrical notes and expanded into a <br />specification requirement for constructing an IRCDUS lift station. EMERGENCY GENERATOR <br />NOTES were placed under a separate heading as well. The EMERGENCY GENERATOR NOTES <br />164 <br />