My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-045A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-045A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:14:20 PM
Creation date
4/2/2018 4:24:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/06/2018
Control Number
2018-045A
Agenda Item Number
8.M.
Entity Name
Timothy Rose Contracting
Subject
Indian River Blvd sidewalk from 37th St. to 53rd St.
Project Number
IRC-1415
Bid Number
2018026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
View images
View plain text
Page i of 3 <br />Board of County Commissioners <br />1801 27th Street <br />Vero Beach, Florida 32960-3365 <br />Telephone: (772) 567-8000 <br />Fax: (772) 778-9391 ' <br />PRE-BID MEETING MINUTES <br />INDIAN RIVER BOULEVARD SIDEWALK FROM 37TH STREET TO 53RD STREET <br />PROJECT IRC -1415 FDOT FM No. 436860-1-58-01 <br />January 10, 2018 at 10:00 AM <br />Conference Room Al -303 <br />The following meeting notes set forth our understanding of the discussions and decisions made at the subject <br />meeting. If no objections, questions, additions, or comments are received within three (3) working days from <br />issuance of the meeting notes, we will assume that our understandings are correct. The project will move <br />forward according to the bid plans and specifications and the understandings herein. <br />PROJECT NAME <br />Indian River Boulevard Sidewalk from 37th Street to 53rd Street <br />BID NUMBER <br />2018026 <br />FM NUMBER <br />436860-1-58-01 <br />INTRODUCTIONS/SIGN IN SHEET <br />This is a Pre-bid meeting; Attendance at this conference by all bidders is MANDATORY. Bidders must sign <br />in before 10:00am to receive credit for attending. <br />CONTRACT DETAILS <br />Bid Opening: Wednesday, January 24, 2018 at 2:00 PM <br />Contract Time: 150 days to substantial completion <br />180 days to final completion <br />Liquidated Damages: $1,584.00 per day <br />CONTACTS BIDDING PROCESS <br />All communications concerning this bid shall be directed to Indian River County Purchasing Division at <br />purchasing@ircgov.com <br />PROJECT DESCRIPTION: The project will consist of construction of a 5' wide concrete sidewalk along the west <br />side of Indian River Boulevard from 371h Street to 53rd Street and approximately 432' on 53rd Street that will <br />join an existing sidewalk to the west. The project will construct pedestrian signals at Indian River <br />Boulevard/37th Street intersection, Indian River Boulevard/41St Street intersection, and Indian River <br />Boulevard/45th Street intersection; construct drainage improvements as needed; perform earthwork <br />F`�Public Works\ENGINEERING DIVISIONT PROJECTS\1415-IR Blvd Sidewalk_37di St to 53rd St\4-Construction\Meetings\Pre-Bid\1415_Pre- <br />Bid Meeting Minutes 201801 I O.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).