Laserfiche WebLink
Page 2 of 3 <br />construction, maintenance of traffic, erosion control and miscellaneous pavement markings as needed. This <br />is an FDOT Local Agency Program `(LAP) funded project FM No. 436860-1-58-01. <br />UTILITIES <br />City of Vero Beach Electric <br />Indian River County Telecommunications <br />Indian River County Traffic <br />AT&T <br />Comcast <br />OTHER ISSUES <br />• Review and comment with questions and clarifications as soon as possible, no further comments 10 <br />days prior to bid opening (January 15, 2018). <br />• The Notice to Proceed tentative issuance is April 11, 2018 <br />• Maintenance of Traffic: <br />o Contractor shall submit a Maintenance of Traffic Plan to the Traffic Division for approval. <br />o Access for all businesses and residential developments shall be maintained at all times. <br />o The Maintenance of Traffic Plan shall meet the FDOT Index 600, 2017 standards. <br />• Embankment material. Payment will be made per material in-place per cubic yard. <br />4 • Excavation Subsoil —to be removed and disposed of by Contractor. This material may be utilized on <br />site if deemed suitable. <br />• PERMITS OBTAINED - St Johns River Water Management District, Permit Number <br />18729-5 <br />FEDERAL REQUIREMENTS: <br />• Invoicing, Jill Williams will process all invoicing. <br />• Indian River County (IRC) is required to satisfy the Federal reporting requirements for this project, <br />such as employment reporting, for both Contractor and all Subcontractors. <br />• In order to be eligible for reimbursement by FDOT/FHWA, IRC must comply with all applicable <br />procedures, standards and directives as described in the FDOT Local Agency Program Manual and the <br />Florida Department of Transportation, Equal Employment Opportunity Construction Contract <br />Compliance Manual, August 17, 2016. <br />• Contractors must meet deadlines in order to be in compliance. All deadlines are strictly enforced or <br />reimbursements cannot be made. <br />• All required forms must be completed and on time or payment could be withheld. <br />• Job Site Bulletin Board is required to be maintained until project is completed. The bulletin board <br />information will be provided by the FDOT. The Contractor is required to properly display and <br />maintain the bulletin board information. <br />• Summary of required contractor form submittals checklist (Section 200, page 8 in contract <br />documents). <br />• Current Wage Determination. * Please Note Common/General Laborer Rates., The Wage <br />Determination provided in the Bid Documents were current at the time of advertising. A new Wage <br />Determination dated 01/05/2018, has been issued since the project advertisement. An updated copy <br />will be sent out in an addendum. <br />• .. FDOT Form 700-010-36, Certification of Sublet Work has been updated since the project was <br />advertised. An updated copy will be sent out in an addendum. <br />• Florida Department of Transportation, Equal Employment Opportunity construction Contract <br />Compliance Manual, August 17, 2016. <br />I'APubiic Works\ENGINEERING DIVISION PROJECTS\]415-IR Blvd Sidewalk_37th _St to 53rd St\4-Construction\Meetines\Pre-Bid`:I415 Pre - <br />Bid Meeting Minutes_20180110.doc <br />