Laserfiche WebLink
Available on website: <br />http://www.dot.state.fl.us/eq ua lopportu n ityoffice/ContractCom pIia nceWorkbook.shtm <br />DISCUSSION <br />• FDOT representatives stated the necessary Federal requirements and provided the <br />backup to be included in Addendum No. 1. <br />• It is beneficial to the prospective Sub -Contractors to be DBE (Disadvantaged Business <br />Enterprise) certified with FDOT. <br />• The. payroll submitted by the Contractor for reimbursement must be certified in order to <br />receive reimbursement. <br />• De -mucking and soil replacement for the project will be field determined as needed <br />during construction. -Unsuitable soils, if encountered, will be part of Regular Excavation <br />and Embankment. <br />• A request for the Engineer's Cost Estimate for the project was made. <br />• Meeting adjourned at 10:30 AM. <br />F:\Public Works\ENGINEERING DIVISION PRO:IECTSU415-111 Blvd Sidewalk _37th St to 53rd St\4-Construction\Meetings\Pre-Bid\1415,_Pre- <br />Bid Meeting Minutes 20180110.doc <br />