My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will help define spare parts inventory needed to improve wellfield <br />reliability. - <br />CONSULTANT will develop a table which outlines the specific requirements and <br />information on each of the wells, wellpumps, and motors. <br />CONSULTANT will evaluate standby generator capability and potential limitations <br />of existing standby power capacity. <br />CONSULTANT will evaluate the applicability of variable frequency drives (VFD's) <br />at the wells which may warrant installation of VFD's. The evaluation will consider <br />return on investment (ROI) and the additional maintenance and replacement costs <br />which can be inherent with VFD installation at wells. <br />Consultant will review existing raw water quality data with respect to the design <br />water quality used for membrane selection. Consultant will provide <br />recommendation of impacts to treatment plant or if further and additional raw <br />water quality analysis is necessary. <br />TASK 3 - SCADA SYSTEM and FIBER SYSTEM EVALUATION - WELLS <br />It is recommended to continue with the PLC upgrade project described in the Final <br />Report - Water Plant SCADA Improvements Evaluation, May 2015, and work <br />completed in early 2016 (Refer to -attached report schedule). The existing PLC and <br />control system is antiquated, has been discontinued, replacements are difficult and <br />costly to acquire, and Allen-Bradley has discontinued manufacturing and support <br />of the PLC5 hardware, which comprises the majority of the hardware at both water <br />plants. The completed system would provide all of the advantages noted <br />previously and also allow for any future changes to well sequencing. This will also <br />allow further well upgrades without installing additional CPU's at additional cost <br />at each of the wells. <br />Consultant will review fiber optic (FO) system, and identify final improvements to <br />complete the FO system to all wells at both water treatment plants. Consultant will <br />review previous construction documents and record drawings, provide field <br />investigations of each wellsite, and verify existing equipment at each well. <br />Consultant will review and identify individual well improvements to integrate FO <br />at each well and develop a summary of improvements that can be designed for <br />212 <br />FAUtilitieAUTILITY - Engineering\WATER\Wells\Admin\IRCU Floridan Well Improvements 1.29.18.docx Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.