My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
implementation. Consultant will investigate the conversion of Hobart well panels <br />to strictly remote I/O versus the existing PLC CPU and 1/0 at each well and <br />provide a summary of recommentions. <br />Consultant will review the SCADA system programming and develop an <br />automated wellfield matrix for each water plant. The current operation at Hobart <br />wellfield includes manipulation of discharge check valve to potentially be closed <br />during pump startup, therefore modification ofthis operation will be evaluated. <br />TASK 4 - PREPARE TECHNICAL REPORT AND DESIGN GUIDELINES <br />Consultant will prepare report on findings, recommendations, costs, summary of <br />individual well improvements, auxiliary power requirements. <br />Consultant will prepare design guidelines for the improvements at each well, <br />including sketches, costs, and list of improvements. Design of these improvements <br />(VFD's, FO, auxiliary power if needed) is not included in this scope, but can be <br />provided as additional services. <br />CONSULTANT will finalize summary report after review meeting and furnish up <br />to six (6) copies of report, including electronic in PDF format. <br />Consultant will attend a coordination meeting to discuss the report on the findings. <br />Summary of Items to Comte <br />OSLO WTP <br />• Review fiber optic (FO) system, identify final improvements to complete FO to all <br />wells <br />• Identify individual well improvements to integrate FO at each well (C&W, CSD) <br />• Conduct well testing and update well performance data — specific capacity, water <br />quality, well pump data (JLA) <br />• Evaluate existing well pump/flows — pump curves, develop RWM model, specific <br />capacity with intent to install VFD's on several wells <br />• Prepare table of complete well data <br />• SCADA review & programming for wellfield matrix, etc. (CSD) <br />• Prepare report on findings, recommendations, costs, auxiliary power (JLA, CSD, . <br />C&W) - <br />• Update design water quality to plant <br />213 <br />F:\Utilities\UTILITY - Engineering\WATER\Wells\Admin\IRCU Floridan Well Improvements 1.29.18.docx Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.