My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• - Define spare parts to improve wellfield reliability <br />• Design improvements (VFD's, FO, auxiliary power if needed) - FUTURE SCOPE <br />HOSART WTP <br />• Evaluate well motors & S/S issues <br />• Review existing FO system, integrate standardization with wells <br />• Identify individual well improvements to integrate FO at each well (C&W, CSD) <br />• Conduct well testing and update well performance data - specific capacity, water <br />quality, well pump data (JLA) <br />• Evaluate well pump/flows - pump curves, develop RWM model, specific capacity <br />with intent to install wells on several wells <br />• Prepare table of complete well data <br />• SCADA review programming for wellfield matrix, etc. (CSD) <br />• Prepare report on findings, recommendations, costs, auxiliary power (JLA, CSD, <br />C&W) <br />• Update design water quality to plant <br />• Define spare parts to improve wellfield reliability <br />• Design improvements (VFD's, FO, auxiliary power if needed) — FUTURE SCOPE <br />SCHEDULE <br />In general, the following schedule is anticipated from notice to proceed (NTP): <br />Task 1 WELL PERFORMANCE - <br />FIELD TESTING 2 - 4 weeks <br />Task 2 EVALUATE EXISTING WELLS 4 - 6 weeks <br />Task 3 SCADA SYSTEM 4 weeks <br />Task 4 PREPARE TECHNICAL REPORT 10 -12 weeks <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Services Contract <br />Agreement for Professional Services dated November 15, 2011, with Indian River <br />County. <br />The Consultant will provide professional services for Task 1 through Task 4 on a <br />lump sum fee basis as follows: <br />214 <br />FAUtilities\UTILITY - Engineering\WATER\Wells\Admin\IRCU Floridan Well Improvements 1.29.18.docx Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.