My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDA Solutions, Inc <br />7622 Emerald Drive <br />West Melbourne, FL 32904 <br />Phone 888-411-2424 Fax 321-674-9143 <br />Name /Address <br />Indian River County Telecom Division <br />180127th Street, <br />FL 32960-3388 <br />IN <br />Estimate <br />Date Estimate # <br />2/1/2018 7687 <br />Ship To <br />Indian River County Admin Building <br />180127th St <br />Vero Beach, FL 32960 <br />Customer Phone (772) 226-1318 <br />P.O. No. <br />Rep <br />Chad <br />Customer E-mail meabo@ircgov.com <br />Description <br />Qty <br />Cost <br />'Total <br />NAS Server for Redundant backup of CCTV county -wide. <br />Q NAP TS -1673U -RP 16 bay storage server <br />1 <br />3,976.00 <br />3,976.00T <br />Seagate SkyHawk 8TB Surveillance Hard Drive 256MB Cache <br />16 <br />348.60 <br />5,577.60T <br />SATA 6.OGb/s 3.5" Internal Hard Drive ST8000VX0022 <br />Labor <br />1 <br />400.00 <br />400.00 <br />RAID 6 16z8TB 112T13 <br />RAID 6 effective 104TB <br />Overhead 39TB <br />Subtotal $9,953.60 <br />TERMS & CONDITIONS <br />Sales Tax (0A%) $0.00 <br />Total $9,953.60 <br />By signing this contract you agree to all terms and conditions <br />Authorized Signature & Title <br />Print name <br />Date <br />Disclaimer: <br />Not all of these policies will apply to every job or project, if you have any questions please ask your representative. <br />Permitting: <br />Permits, if required by the municipality will have a base cost of $300.00 and if site specific engineering is required it will be an additional cost. Permit package <br />includes manufacturing engineering submittals. If municipality requires site specific engineering it will be at an additional cost to be determined by an engineer. We <br />cannot guarantee length of time for the permitting process. <br />Existing Construction: <br />Any opening not built to current wind load codes may need to be updated to comply with manufacture engineering. This includes missing or damaged lintels and <br />hollow blocks. Customer will be presented with an estimate for CDA to replace lintel or fill hollow blocks. Work may also be subcontracted out to another company. <br />Lead Times: <br />CDA will not be responsible for delays due to unavoidable casualties, inclement weather, acts of god or shortages of materials from manufacturer. <br />Special order items are nonrefundable and may take 6-8 weeks for delivery. <br />Payment terms: <br />A deposit of 50% of the total estimate is required, unless other arrangements are made. We will not book, order pails, or allocate labor in any way <br />until a signed contract and deposit is received. Balance is to be paid when said job is 98% complete. With this agreement, you assume liability for <br />any and all additional costs or fees that may occur due to non-payment, including, but not limited to court costs and/ or legal fees. <br />234 <br />
The URL can be used to link to this page
Your browser does not support the video tag.