My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDA Solutions, Inc <br />7622 Emerald Drive <br />West Melbourne, FL 32904 <br />Phone 888-411-2424 Fax 321-674-9143 <br />Name /Address <br />Indian River County Utilities <br />1801 27th street, Bldg. A <br />vero beach, FL 32960 <br />Ship To <br />Indian River County Utilities <br />Operations Area <br />Estimate <br />Date Estimate # <br />1/24/2018 7258 <br />Authorized Signature & Title <br />Print name Date <br />Disclaimer: ; <br />Not all of these policies will apply to every job or project, if you have any questions please ask your representative. <br />Permitting: <br />Permits, if required by the municipality will have abase cost of $300.00 and if site specific engineering is required it will boon additional cost Permit package <br />includes manufacturing engineering submittals. if municipality requires site specific engineering it will be at an additional cost to be determined by an engineer. We <br />cannot guarantee length of time for the permitting process. <br />Existing Construction: <br />Any opening not built to current wind load codes may need to be updated to comply with manufacture engineering. This includes missing or damaged lintels and <br />hollow blocks. Customer will be presented with an estimate for CDA to replace lintel or fill hollow blocks. Work may also be subcontracted out to another company. <br />Lead Times: <br />CDA will not be responsible for delays due to unavoidable casualties, inclement weather, acts of god or shortages of materials from manufacturer. <br />Special order items are nonrefundahle and may take 6-8 weeks for delivery. <br />Payment terms: <br />A deposit of 50% of the total estimate is required, unless other arrangements are made. We will not book, order parts, or allocate labor in any way <br />until a signed contract and deposit is received. Balance is to be paid when said job is 98% complete. With this agreement, you assume liability for <br />any and all additional costs or fees that may occur due to non-payment, including, but not limited to court costs and/ or legal fees. <br />Page 1 <br />235 <br />P.O. No. <br />Rep <br />Customer Phone 772-226-3405 <br />Chad <br />Customer E-mail rpfarr(a�ircgov.com <br />Description <br />Qty <br />Cost <br />Total <br />Blackjack Cube Nvr Powerd By Spectrm Ipvms 12T6 <br />4,318.05 <br />4,318.05T <br />4 Dw Spectrum License (included) <br />0.00 <br />O.00T <br />10 DwSpectrum Ipvms License <br />741.39 <br />741.39T <br />8MP/4K IR Network PTZ Camera with auto track H265 <br />3 <br />3,300.00 <br />9,900.00T <br />4 MP VF vandome H.265 <br />7 <br />288.75 <br />2,021.25T <br />4 MP fixed 2.8 wide H.265 (fisheye substitution) <br />4 <br />250.00 <br />1,000.00T <br />10/100/1000 base fiber optic communicators <br />3 <br />135.00 <br />405.00T <br />Wall Mount <br />4 <br />30.75 <br />123.00T <br />Ubiquiti Toughswitch. POE 8 channel. <br />4 <br />250.00 <br />1,000.00T <br />Video BLN Video BLN POE over coax <br />3 <br />207.88 <br />623.64T <br />Camera labor <br />23 <br />125.00 <br />2,875.00T <br />Crew Labor <br />9 <br />125.00 <br />1,125.00 <br />Miscellaneous materials <br />1,500.00 <br />1,500.00T <br />Subtotal <br />TERMS & CONDITIONS <br />Sales Tax (0.0%) <br />Total <br />By signing this contract you agree to all terms and conditions <br />Authorized Signature & Title <br />Print name Date <br />Disclaimer: ; <br />Not all of these policies will apply to every job or project, if you have any questions please ask your representative. <br />Permitting: <br />Permits, if required by the municipality will have abase cost of $300.00 and if site specific engineering is required it will boon additional cost Permit package <br />includes manufacturing engineering submittals. if municipality requires site specific engineering it will be at an additional cost to be determined by an engineer. We <br />cannot guarantee length of time for the permitting process. <br />Existing Construction: <br />Any opening not built to current wind load codes may need to be updated to comply with manufacture engineering. This includes missing or damaged lintels and <br />hollow blocks. Customer will be presented with an estimate for CDA to replace lintel or fill hollow blocks. Work may also be subcontracted out to another company. <br />Lead Times: <br />CDA will not be responsible for delays due to unavoidable casualties, inclement weather, acts of god or shortages of materials from manufacturer. <br />Special order items are nonrefundahle and may take 6-8 weeks for delivery. <br />Payment terms: <br />A deposit of 50% of the total estimate is required, unless other arrangements are made. We will not book, order parts, or allocate labor in any way <br />until a signed contract and deposit is received. Balance is to be paid when said job is 98% complete. With this agreement, you assume liability for <br />any and all additional costs or fees that may occur due to non-payment, including, but not limited to court costs and/ or legal fees. <br />Page 1 <br />235 <br />
The URL can be used to link to this page
Your browser does not support the video tag.